Browse
Search
Agenda - 11-08-2012 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 11-08-2012 - Regular Mtg.
>
Agenda - 11-08-2012 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 12:16:44 PM
Creation date
11/8/2012 11:33:47 AM
Metadata
Fields
Template:
BOCC
Date
11/8/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 11-08-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> High Schools 2,308 2,518 210 2,770 <br /> Middle Schools 1,672 2,166 494 2,383 <br /> Elementary 3,401 3,694 293 4,063 <br /> Schools <br /> TOTALS 7,381 8,378 997 9,216 <br /> 1 <br /> 2 <br /> 3 Membership versus SAPFO with Revised OHS Capacity <br /> 4 <br /> Day 10 SAPFO Capacity Available LOS Capacity <br /> Membershi Seatin <br /> Hi h Schools 2,308 2,371 63 2,608 <br /> Middle Schools 1,672 2,166 494 2,383 <br /> Elementary 3,401 3,694 293 4,063 <br /> Schools <br /> TOTALS 7,381 8,231 850 9,054 <br /> 5 <br /> 6 High School Capacity <br /> 7 <br /> Membershi Ca acit LOS Ca acit 110% <br /> Cedar Ridge 1,089 1,000 1,100 <br /> 109% of capacity <br /> Orange High 1,219 1,518 1,670 <br /> 80% of ca acit <br /> Oran e Hi h 1,219 1,371 1,508 <br /> 89% of capacity <br /> 8 <br /> 9 Superintendent Rhodes said that he has included a letter from Hillsborough Planning <br /> 10 Director Margaret Hauth talking about the Waterstone and Forest Ridge developments. The <br /> 11 plans are approved and there are 495 units coming online in 2013-14. He also pointed out a <br /> 12 letter that was sent to the Board of County Commissioners last spring from the Chair and Vice- <br /> 13 Chair highlighting some of the growth, especially in Mebane, which has not been included in this <br /> 14 report. <br /> 15 <br /> 16 Anne Medenblik arrived at 7:10 PM. <br /> 17 <br /> 18 Superintendent Rhodes referred to the Pre-K chart in the green folder. The idea was to <br /> 19 highlight the impact of Pre-K on enrollment. There are 9 classrooms dedicated to pre-k <br /> 20 classrooms. Their board is committed to every child and the Pre-K programs have been <br /> 21 expanded since State funds have become available to them. <br /> 22 Commissioner Hemminger asked if there were more children needing Pre-K than there <br /> 23 was space and Superintendent Rhodes said yes. <br /> 24 Commissioner Gordon made reference to Attachment 1, page three at the top in the <br /> 25 abstract, and the last paragraph. She read this: <br /> 26 "The effect of adding Pre-K capacity and decreasing K-5 capacity would also affect the <br /> 27 Orange County/Boards of Education school construction standards, which attempt to develop <br /> 28 schools with certain rated capacity." She asked for an explanation of this. <br /> 29 Superintendent Rhodes said that the last elementary school was constructed in 2002 <br /> 30 and none of the other OCS elementary schools were designed for Pre-K, but CHCCS has been <br /> 31 able to include Pre-K in its new school construction standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.