Orange County NC Website
• Gas Transmission Line {Landfill to Carolina North Campus) <br />• Fuel Conditioning & Microturbine {Carolina North Campus) <br />Energy Summary <br />Economic Evaluation <br />{Average Annual Costs) <br />Considerations <br />• Preliminary Economic Assessment <br />' Separate Cogeneration Facility <br />• Must Maximize Cogeneration Energy Production and Usage <br />' Alternative Fuel <br />• Natural Gas Substitute <br />Average 10-Year Cost <br />Considerations <br />' Delays in Carolina North Development Timeline Could Adversely Impact Project <br />Feasibility <br />' Time Dependent Decline in LFG Generation Rates <br />• Environmental Benefits <br />' Green Power/Energy Conservation <br />' LFG Emission Reduction from Landfills <br />Conclusions <br />• Eubanks Road Project Does Not Appear to be Economically Viable <br />• Use of LFG as a Renewable Energy Source by the University at the Proposed <br />Carolina North Campus Appears to be Economically Viable <br />Recommendations <br />• Pursue Further Discussions with the University Regarding the Sale of LFG for Use at <br />the Proposed Carolina North Campus <br />' Collection, Cleanup and Transmission of LFG, only <br />• Develop Implementation Approach <br />Key Implementation Steps <br />• Establish Philosophical Approach <br />^ Maximize Revenue Potential <br />^ Balance Ecanomic & Environmental Benefits <br />• Present Final Economic Evaluation to University <br />• Establish General Energy Contract Frame Work <br />• Conduct LFG Testing Program <br />• Finalize Implementation Plan <br />