Browse
Search
Minutes - 20070412
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2000's
>
2007
>
Minutes - 20070412
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2008 1:34:22 PM
Creation date
8/13/2008 2:49:41 PM
Metadata
Fields
Template:
BOCC
Date
4/12/2007
Document Type
Minutes
Document Relationships
Agenda - 04-12-2007-1
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 04-12-2007
Agenda - 04-12-2007-2
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 04-12-2007
Agenda - 04-12-2007-3
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 04-12-2007
Agenda - 04-12-2007-4
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 04-12-2007
Agenda - 04-12-2007-5
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 04-12-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Gas Transmission Line {Landfill to Carolina North Campus) <br />• Fuel Conditioning & Microturbine {Carolina North Campus) <br />Energy Summary <br />Economic Evaluation <br />{Average Annual Costs) <br />Considerations <br />• Preliminary Economic Assessment <br />' Separate Cogeneration Facility <br />• Must Maximize Cogeneration Energy Production and Usage <br />' Alternative Fuel <br />• Natural Gas Substitute <br />Average 10-Year Cost <br />Considerations <br />' Delays in Carolina North Development Timeline Could Adversely Impact Project <br />Feasibility <br />' Time Dependent Decline in LFG Generation Rates <br />• Environmental Benefits <br />' Green Power/Energy Conservation <br />' LFG Emission Reduction from Landfills <br />Conclusions <br />• Eubanks Road Project Does Not Appear to be Economically Viable <br />• Use of LFG as a Renewable Energy Source by the University at the Proposed <br />Carolina North Campus Appears to be Economically Viable <br />Recommendations <br />• Pursue Further Discussions with the University Regarding the Sale of LFG for Use at <br />the Proposed Carolina North Campus <br />' Collection, Cleanup and Transmission of LFG, only <br />• Develop Implementation Approach <br />Key Implementation Steps <br />• Establish Philosophical Approach <br />^ Maximize Revenue Potential <br />^ Balance Ecanomic & Environmental Benefits <br />• Present Final Economic Evaluation to University <br />• Establish General Energy Contract Frame Work <br />• Conduct LFG Testing Program <br />• Finalize Implementation Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.