Browse
Search
Agenda - 09-24-2001 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 09-24-2001
>
Agenda - 09-24-2001 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 10:29:07 AM
Creation date
10/30/2012 10:28:51 AM
Metadata
Fields
Template:
BOCC
Date
9/24/2001
Meeting Type
Schools
Document Type
Agenda
Agenda Item
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rU �!) J J taufz <br /> One component not addressed in the County's current School Construction Standards <br /> Report is the rate of inflation to apply for future projects. Figure 29 compares the current <br /> standards with actual square footage costs for schools constructed since the School <br /> Construction Standards were adopted in 1996 (elementary and middle schools) and <br /> 1999 (high schools). <br /> Figure 29. New School Construction (Only)Costs <br /> Projects Completed After School Construction Standards Adopted by BOCC <br /> Construction <br /> Construction Total Square Cost Per <br /> School Year Opened (Only) Costs Feet Square Foot <br /> Elementary School Standards $8,570,250 95,225 $90 <br /> Scroggs Elementary(CHCCS) 2000 $9,131,851 90,980 $100 <br /> Pathways Elementary (OCS) 2000 $8,082,331 85,282 $95 <br /> Total Construction Cost for Elementa!y $17,214,182 176,262 $98 <br /> Middle School Standards $12,558,240 132,192 $95 <br /> 2001 <br /> Smith Middle School (CHCCS) (anticipated) $12,905,699 128,764 $100 <br /> Total Construction Cost for Middle Schools $12,905,699 128,764 $100 <br /> High School Standards(1,000 student school) Ranges from Ranges from <br /> $16,615,390 to 151,049 to <br /> $20,098,100 182,710 $110 <br /> 200-2- <br /> Cedar Ridge High (OCS) (anticipated) $18,748,526 206,900 $91 <br /> Total Construction Cost for High Schools $18,748,526 206,900 $91 <br /> Average Construction Cost for All Levels 7$48,868,407 511,926 $951 <br /> After considering information included in the chart above, the Task Force recommends <br /> that the Board use the average per square foot cost as a base in which to apply an <br /> annual inflationary factor. For example, average per square foot costs for the two <br /> recently constructed elementary schools, Scroggs and Pathways, was $98. This would <br /> become the new standard for projects planned after the upcoming fiscal year (2001-02) <br /> and beginning in fiscal year 2002-03; an annual inflation factor of two and one-half <br /> percent would be applied to per square foot costs. <br /> 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.