Orange County NC Website
The current construction standards identify eight major elements of capital projects <br /> including site acquisition, site development, construction costs, fees, technology, <br /> moveable equipment, start-up costs and contingency. The following chart provides <br /> definitions and examples of project components: <br /> Figure 28. Recommended Definitions and Examples of Project Components <br /> • Purchase price of property <br /> • Survey <br /> • Deed recording <br /> Site Acquisition— . Appraisals <br /> Costs associated with . Soil testing <br /> acquiring a site Legal fees associated with purchase and recording <br /> • Pre-grading <br /> • Grading to include playing fields and playgrounds <br /> • Installation of storm water run-off drainage <br /> Site Development— . Soil borings (rock) <br /> Costs of preparing the . Utility extension/installation <br /> site for construction . Sidewalks <br /> • Turn lanes <br /> • Municipal Requirements <br /> • Prime Construction Contracts (includes general contractor, electrical <br /> Construction Costs— contractor, HVAC contractor, plumbing contractor) <br /> Costs of constructing a . Other construction related work <br /> new facility or Sprinkler <br /> renovating an existing ' <br /> one ' Expanded Water Flows <br /> • Architectural & engineering services (examples: educational <br /> specifications and programming, schematics and design development, <br /> bidding, construction documents, construction administration, <br /> reimbursables, furniture selection) <br /> Fees-Costs of • On-site engineering control inspections <br /> • Materials testing <br /> application and permit • Topographic and boundary studies <br /> fees and professional • Local government applications and permit fees (examples: special use <br /> fees permits, conditional use permits, zoning permits, building permits) <br /> • Specialized consultants (examples: traffic engineer, environmental <br /> specialist, project scheduler/expeditor) <br /> • Connect fees to utilities <br /> 32 <br />