Orange County NC Website
Orange County Schools <br /> The Orange County Schools District has constructed three new schools, two elementary <br /> schools and one middle school, since 1991 increasing capacity by 1,961 seats. In <br /> addition, the District is currently constructing a new 1,000-student high school, Cedar <br /> Ridge High School. In 1990 (New Hope Elementary opened in fall 1991), the District's <br /> capacity was 4,843 students. With the opening of Cedar Ridge High in fall 2002, <br /> capacity will be 7,804. The two new elementary schools have provided 1,221 additional <br /> seats for elementary students while A. L. Stanback Middle School has provided 740 <br /> new seats. <br /> Since 1991, more than $34.9 million has been invested in new schools (schools <br /> currently in operation) in the Orange County Schools District. This equates to $10,117 <br /> per seat. The projected cost of Cedar Ridge High is just over $27.9 million bringing the <br /> total new school investment for this district to $62.8 million or$15,023 per seat. <br /> Figure 3. Orange County's Ten Year Investment in New Schools <br /> Orange County Schools <br /> Site Acquisition Site Development&Facility Construction Total Investment <br /> Cost Per Total Cost <br /> Project Costs Square Per Square Capital Cost <br /> School Acreage Total Site Cost Cost Per Acre Square Feet (excluding land) Foot Total Project Cost Foot Per Seat <br /> Schools Currently In Operation <br /> New Hope Elementary 26.00 5415,630 $15,986 100,164 $8,437,878 $ 84 $8,853,508 $88 $ 14,855 <br /> Pathways Elementary 18.00 $ donated 85,282 $11,437,720 $ 134 $11,437,720 $134 $ 18.781 <br /> Total Elementary 44.00 5415,630 185,446 519,875,598 S 107 S20,291,228 S109 S 16,839 <br /> A.L.Stanback 35.90 $807,959 522,506 136,000 513,826,370 $ 102 $14,634,329 5108 $ 19,992 <br /> Total Middle 35.90 1 136,000 $13,826,370 S 102 514,634,329 5108 S 19,992 <br /> Total <br /> 18.00 dottsted a owned b district <br /> 61.90 $1,223,589 S 19,767 321,446 533,701,968 S 105 I 534,925,557 5109 S 10,117 <br /> Schools Currently Under Construction <br /> Cedar Ridge High 71.00 5660,636 $9,305 206,900 $27,268,364 S 132 $27,929,000 $135 $ 38,154 <br /> Total Investment In New 18.00 scmW domlied or owned la district <br /> Schools for OCS <br /> 132.90 51,884,225 S 14,178 528,346 S60,970,332 S 115 562,854,557 S119 J$ 15,023 <br /> 7 <br />