Orange County NC Website
`vk lf"_ - <br /> INITIAL DRAFT <br /> Possible Outline of Master Plan Process <br /> (Staff Proposal), <br /> Chapel Hill Township Park and Educational Campus <br /> August 27, 2001 <br /> The following is staffs initial attempt to outline a decision-making process for <br /> this site. This may or may not be the appropriate process to be used, pending <br /> the Board's discussion. <br /> Description 1 Step <br /> 1 Form BOCC Work Group to discuss uses, July-September, 2001 <br /> guiding principles for site and planning <br /> process <br /> 2 Recommendations from Work Group on October 22, 2001 <br /> Conceptual Site Plan, Master Planning <br /> Process and Guiding Principles (basic uses <br /> for the site, general locations for said uses, <br /> operating rinci les <br /> 3 Board of Commissioners deliberations on November-December, <br /> Work Group report 2001 <br /> 3 A Master Plan Work Group is created and January - June 2002 <br /> meets to develop details of the Master <br /> Phasing Plan for the site <br /> 4 Master Plan Work Group August, 2002 <br /> recommendations presented to BOCC <br /> 4 BOCC Deliberations, Proposal for Phase I September, 2002 <br /> of Park/Campus <br /> 5 Detailed Site Plans (engineering detail) October-November 2002 <br /> are prepared for Phase I <br /> 6 Carrboro Conditional Use Permit Process November 2002 —April <br /> for both Phase I and overall Master Plan 2003 <br /> 7 Tentative Phase I Construction May 2003—April 2004 <br /> October 2001 Report from BOCC Work Group <br /> This report would set a strong framework and outline parameters for the <br /> master plan process. In' this arrangement, the Board of Commissioners would <br /> define expectations and direction of the Master Plan work - defining all <br /> primary uses and the locations of uses, including the type of schools/school <br />