Browse
Search
Minutes - 20070320
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2000's
>
2007
>
Minutes - 20070320
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2008 1:37:29 PM
Creation date
8/13/2008 2:48:53 PM
Metadata
Fields
Template:
BOCC
Date
3/20/2007
Document Type
Minutes
Document Relationships
Agenda - 03-20-2007-
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 03-20-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aae of Ancillary Facilities <br />FACILITY YEAR OPENED <br />Board of Education 1971 <br />Maintenance Office 1940 <br />Transportation Office 1971 <br />2006-07 Fundina Received <br />CIP Recurring Capital <br />$1, 630, 655 $941, 520 <br />School By School List ofNeeds -tables <br />Superintendent Carraway said that the Board of Education, at its meeting last night, <br />approved moving forward with the First School concept, partnering with Frank Porter Graham. <br />The plan is to site the First School at Central Elementary. There is nothing in the CIP <br />information about this, because the needs are unknown at this time. <br />She said that OCS is in the middle of a space study for the staff, and until this study is <br />completed, the needs for additional office space at the Central Office are unknown. The hope is <br />to have this information very soon. At this time, there is staff scattered throughout different <br />school buildings. <br />Critical Capital Needs <br />• HES <br />o Fire Alarm Upgrade <br />• CWSMS <br />o Air Handler Replacement <br />o Interior Lighting Upgrade <br />o Ceiling Grid and Tile Replacement <br />o Intercom System Replacement <br />• OHS <br />o Bathroom Renovations <br />o Track Renovation <br />o Tennis Court Renovation <br />o Moisture Barrier Installation <br />o Baseball Field Lighting Replacement <br />Commissioner Nelson asked about the acreage of the Central office site and it was <br />answered about two acres. Commissioner Nelson asked about the total Central office staff and <br />Shirley Carraway said that there are about 30-35 people that are spread out in other buildings. <br />The Central office staff consists of the Superintendent's immediate staff, the Payroll <br />Department, and the Personnel Department. <br />Commissioner Nelson asked for clarification on the HVAC needs at Cameron Park and <br />Superintendent Carraway answered that this is for the gym because the units have been falling <br />off the wall. Regarding the rest of the HVAC at Cameron Park, the cooling towers have been <br />replaced. <br />
The URL can be used to link to this page
Your browser does not support the video tag.