Browse
Search
2012-388 Planning - J F Wilkerson Contracting Co Future connection stub out N Oak Street $22,496.60
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-388 Planning - J F Wilkerson Contracting Co Future connection stub out N Oak Street $22,496.60
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2012 2:25:57 PM
Creation date
10/29/2012 2:22:31 PM
Metadata
Fields
Template:
BOCC
Date
10/2/2012
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5i
Document Relationships
2012-388 S Planning - J F Wilkerson Contracting Company Future Connection stub-out on N Oak St $22,496.60
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
Agenda - 10-02-2012 - 5i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 10-02-2012 - Regular Mtg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order <br /> No. 4 <br /> Date of Issuance: October 16, 2012 Effective Date: October 16, 2012 <br /> Project:Buckhorn Area North of I-85 and Owner: Orange County, Owner's Contract No.: SRF: CS370884-01 <br /> Efland Sewer System Improvements North Carolina STAG: XP95456411 <br /> Contract:Buckhorn Area North of I-85 and Efland Sewer System Date of Contract: August 31,2011 <br /> Improvements <br /> Contractor:J.F. Wilkerson Contracting Company,Inc. Engineer's Project No.: 11.01111 <br /> The Contract Documents are modified as follows upon execution of this Change Order: <br /> Description: <br /> Provide a future connection stub-out on the force main at North Oak Street and Highway 70 as shown on the <br /> revised drawing E-3.1 including additional pipe,wye,valve, and bore-and-jack. <br /> Attachments(list documents supporting change): <br /> Revised Drawing E-3.1 (sealed 9-12-12)and JF Wilkerson letter dated September 20,2012. <br /> CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: <br /> Original Contract Price: Original Contract Times: ❑ Working days ® Calendar days <br /> Substantial completion(days or date): 450 Days <br /> $ 2,942,954.46 Ready for final payment(days or date): 450 Days <br /> [Increase] [Decrease] from previously approved [Increase] [ ] from previously approved Change Orders <br /> Change Orders No. to No. 3: No. to No. 3: <br /> Substantial completion(days): 90 Days <br /> $ 336,436.22 Ready for final payment(days): 90 Days <br /> Contract Price prior to this Change Order: Contract Times prior to this Change Order: <br /> Substantial completion(days or date): 540 Days <br /> $ 3,279,390.68 Ready for final payment(days or date): 540 Days <br /> [Increase] [ ] of this Change Order: [Increase] [Deer-ease] of this Change Order: <br /> Substantial completion(days or date): 0 Days <br /> $ 22,496.60 Ready for final payment(days or date): 0 Days <br /> Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: <br /> Substantial completion(days or date): 540 Days <br /> $ 3,301,887.28 Ready for final payment(days or date): 540 Days <br /> REC VYWID: ACCEPTED: ACCEPTED: <br /> By: By: By. c <br /> Engin er(Au orized Signature) Owner(Authorized 'gature) ntra or(Authorized Signature) <br /> Date: 1(Q-OGT- 2a 12 Date: z/ Date: Octa6c r 16'. ZVi Z <br /> Approved by Funding Agency(if applicable): <br /> Date: <br /> EJCDC C-941 Change Order <br /> Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.