Orange County NC Website
a DRAFT 7 <br /> Alternative roads <br /> From DOT's list <br /> In priority order by what is preferred by the work group: <br /> 1. Elizabeth Brady alignment 3,which does not cross the river, goes across ridge(IF <br /> this is the least impact to the river) <br /> 2. Elizabeth Brady alignment 2 (averts racetrack, crosses river) <br /> 3. (original)Elizabeth Brady alignment 1 <br /> 4. Lawrence Road(with 86 connector)—but different function from above <br /> 5. Western bypass <br /> 6. No build <br /> 7. Widen Churton St. from 70 business to 70 bypass <br /> Other Proposed road projects <br /> Please review these carefully because I don't know these roads, and code to map <br /> ➢ Amended northwest bypass using existing wads <br /> Connector from Lawrence Rd. to 86 <br /> ➢ New interchange on 1-85 and road connecting 70 and New Hope Church Rd. <br /> ➢ Straighten(and widen?)Efland Cedar Grove Rd., and improve near 1-85 <br /> 70A cross-connector to Orange Grove Road, over RR tracks <br /> ➢ Northeastern loop connector <br /> ➢ Entire perimeter of DOT study area, as a road <br /> ➢ East-west connector adjacent to Duke Forest <br /> ➢ East-west connector between 86 and Old 86 <br /> Widening of 70 bypass (in town plan but not in state TIP) <br /> Recommendations from group <br /> Expand the DOT study area to the entire 50-year water and sewer boundary from the <br /> town plan <br /> ➢ Have DOT continue with its existing list of options <br /> ➢ Consider DOT's current study area boundary as a road alignment, adjusted as needed <br /> and using existing roads where possible <br /> ➢ Design and build the Elizabeth Brady road extension to minimize the impact on the <br /> Eno River,even if it reduces mobility <br /> ➢ Treat Elizabeth Brady Rd. as a local road,not a bypass <br /> ➢ Treat Lawrence Rd. option as having a different function from Elizabeth Brady,to <br /> move through traffic around,not through, downtown <br /> ➢ Develop a new interchange of I-85 east of Lawrence Rd. <br /> ➢ Do other non-road fixes too <br /> Issues for another day <br /> Non-road improvements needed <br /> 4 <br />