Browse
Search
Agenda - 09-18-2001 - 8j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 09-18-2001
>
Agenda - 09-18-2001 - 8j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2012 12:17:38 PM
Creation date
10/29/2012 12:17:34 PM
Metadata
Fields
Template:
BOCC
Date
9/18/2001
Document Type
Agenda
Agenda Item
8j
Document Relationships
Minutes - 09-18-2001
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 -- <br /> with decals identifying which materials go into the recycling cart. If at all possible,the Contractor <br /> decal shall be placed at the lower section of the cart on the side with the handle. <br /> SECTION 9 <br /> TransRortation of Recyclable Materials and Non-recyclable materials <br /> Contractor shall transport the collected Recyclable Materials to its Processing Site(s). Contractor <br /> shall take title to the Recyclable Materials upon placement in the container by residents in <br /> accordance with Section 4 and shall be responsible for the sale of such recyclable materials and all <br /> of the proceeds of the sales. Recyclable Materials shall be property of Contractor. <br /> No uncontaminated recyclable materials collected in this program shall be landfilled. Prior to <br /> landfilling any materials collected from the multifamily recycling program,Contractor shall contact <br /> County and request written authorization to landfill or incinerate contaminated recyclables collected <br /> in this program. Failure to gain written authorization to dispose of these materials by landfilling or <br /> incineration shall result in a penalty of$250 per incident of unauthorized disposal to a landfill or <br /> incinerator. <br /> County has arrangements with the Town of Chapel Hill to provide a loading dock and temporary <br /> storage at the Town of Chapel Hill Public Works Facility located at 1099 Airport Road. Contractor <br /> may,with explicit permission of County and the Town of Chapel Hill,make use of this facility in a <br /> manner cooperative with other users. Contractor, along with other site users, shall be responsible <br /> for keeping this area clean,safe and free of blowing trash or debris from its operation. No more <br /> than eight(8)roll-off containers for the storage of recyclable materials belonging to Contractor shall <br /> accumulate at this site. If more than eight containers for the storage of recyclable materials <br /> accumulate,County or the Town of Chapel Hill may remove the containers at the expense of <br /> Contractor after 24 hours written or faxed notice to Contractor. <br /> Contractor may be asked to occasionally provide County access to the roll-off containers used to <br /> collect and temporarily store recyclable materials at the loading dock facility located at 1099 Airport <br /> Road. When and if deemed necessary,County may use said roll-off containers to deposit <br /> recyclables collected and properly sorted by its recycling programs. Contractor shall take <br /> possession of and title to said materials at the time said materials are deposited into the roll-off <br /> containers by County. Contractor shall enjoy any revenue gained from the marketing of said <br /> materials. <br /> Contractor's failure to clean the temporary storage site within two(2)business days of written or <br /> faxed notification by County may result in County hiring a service to clean the area with the costs of <br /> the service to be deducted from the following month's invoice. Cost of cleaning service shall not <br /> exceed$250.00 without due notification of Contractor. <br /> Contractor at its own expense may choose to pay for any necessary repairs or improvements to the <br /> concrete pads,retaining walls,and/or drainage systems that have been built at the temporary loading <br /> dock. Estimated costs of specific repairs or improvements may be negotiated with County. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.