Browse
Search
Agenda - 09-18-2001 - 8j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 09-18-2001
>
Agenda - 09-18-2001 - 8j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2012 12:17:38 PM
Creation date
10/29/2012 12:17:34 PM
Metadata
Fields
Template:
BOCC
Date
9/18/2001
Document Type
Agenda
Agenda Item
8j
Document Relationships
Minutes - 09-18-2001
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 " <br /> month, and$164.44 per Double Site per month. The number of Double Sites at this price shall <br /> be limited to twenty-five(25). Cost of specialized sites for collection of newspaper only from <br /> 90 gallon roll carts shall be$34.55 per site per month for weekly collection. These sites shall be <br /> limited to areas that are contiguous with existing routes. There shall be a limit of three(3)of <br /> these newspaper-only sites. <br /> b) Contractor may charge County a monthly fee for collection from sites within the Town of <br /> Hillsborough or anywhere north of Interstate 40 and within Orange County. This fee,or travel <br /> surcharge, shall not exceed$175 per month,regardless of the number of sites served. For <br /> example,the cost of serving a site in Hillsborough shall be the standard monthly site charge <br /> ($111.59 per Single Site, $164.44 per Double Site and$55.86 per Half Site)plus the travel fee. <br /> c) The collection price for all sites over twenty-two (22)carts shall be negotiated between <br /> Contractor and County. Any sites that require collection frequencies or cart quantities other <br /> than stipulated within this contract are to be negotiated between County and Contractor on a <br /> case by case basis. <br /> d) If County and Contractor choose to extend this contract beyond the initial term,the formula for <br /> negotiating future costs is to be as follows: <br /> The monthly cost per site for any future term of this contract may not exceed the monthly cost <br /> per site of the previous term multiplied by a factor equal to the Federal Bureau of Labor <br /> Statistics Consumer Price Index for Transportation for the South Urban region as measured at <br /> the time of negotiation for the future term and compared to the index at the time the per site <br /> price for the previous term was set(the price for the initial term was set in February 2001). <br /> e) This contract may be expanded or contracted at the option of the County to include additional <br /> or fewer multifamily sites. County agrees to limit elimination of sites during any one <br /> contract period to the extent that annual gross revenue to Contractor shall not be reduced by <br /> more than 10 percent. For the sake of this clause only, annual gross revenue shall be <br /> determined by taking the bill for the first month of the contract term and multiplying by <br /> twelve(12). More specifically this amount(annual gross revenue) shall be determined by <br /> applying the standard per site charge(Section 3, subsection a)to the site list, attachment A, <br /> and multiplying by 12. Reduction of service beyond this aforementioned level may not take <br /> place without agreement of Contractor. <br /> SECTION 4 <br /> Scope of Services <br /> Contractor shall perform Recycling Collection Services in the Towns or Orange County as follows: <br /> Contractor shall collect and remove for marketing or reuse all Recyclable Materials which are <br /> "segregated" and placed in Recycling Containers at the recycling sites at apartment complexes listed <br /> in Attachment A. The Recycling Collection Services performed may be expanded as the budget <br /> and other constraints permit. Collection fees for sites that are added shall be paid in accordance <br /> with Section 3 above. <br /> At sites collected on a weekly basis, Contractor shall not be required to empty recycling <br /> containers less than one quarter(1/4) full. At sites with collection intervals greater than one <br /> week(more than 7 days apart), all containers must be emptied. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.