Browse
Search
Agenda - 09-18-2001 - 8j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 09-18-2001
>
Agenda - 09-18-2001 - 8j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2012 12:17:38 PM
Creation date
10/29/2012 12:17:34 PM
Metadata
Fields
Template:
BOCC
Date
9/18/2001
Document Type
Agenda
Agenda Item
8j
Document Relationships
Minutes - 09-18-2001
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> SECTION 10 <br /> Labor and Costs <br /> Contractor shall, at its sole cost and expense, except as otherwise provided herein, furnish all labor <br /> and equipment required to perform multifamily collection of Recyclable Materials pursuant to this <br /> Agreement. <br /> SECTION 11 <br /> Procedures and Penalties for Missed Pick-Ups or Overflows of Materials Collected in this <br /> Program <br /> In case of a missed pick-up or an overflow reported by the Towns,County,management of a <br /> multifamily site,or a resident, Contractor shall collect the Recyclable Materials from such point by <br /> 5:00 PM of the working day following written or faxed notification if point was accessible and not <br /> blocked. All calls relating to missed pick-ups, overflows,or other collection problems shall be <br /> logged by County and such log shall be available for inspection by County. <br /> a) Penalty for Missed Collection <br /> If containers at any recycling site which were recorded by County as not collected by Contractor <br /> are not collected by 5:00 PM of the working day(including Monday through Friday,but not <br /> Saturdays, Sundays or designated holidays) following written or faxed notification of Contractor <br /> by County,County may levy daily penalties equal to $10.00 per site per day not collected. Any <br /> resultant penalty shall begin accruing on the day after collection should have taken place, and <br /> will continue to accrue until collection has taken place. Penalties for missed collections may be <br /> enacted regardless of whether or not there is material overflow. <br /> Example of penalty determination: If a single site that was scheduled for Monday service is <br /> reported as having been missed,and the site is not collected until Friday,then the daily penalty <br /> shall be$10.00 per day not collected,with fines beginning to accrue on Tuesday. The total <br /> penalty in this instance shall be$40.00($10.00 penalty for each day,Tuesday through Friday, <br /> including Friday). <br /> b) Penalty for Overflows <br /> County may levy penalties beyond the Missed Collection penalty for overflows that are a result <br /> of missed collections. If a site that has been collected on schedule is repeatedly subject to <br /> overflow, and this overflow is not due to a missed collection, County may request that <br /> Contractor install additional carts. In case of overflow not caused by missed collection,if <br /> County requests additional carts be installed at the site in question,Contractor must place <br /> additional carts in the field by 5 PM of the second working day following said request.. <br /> When overflow is determined by County to be caused by Contractor's failure to collect, <br /> penalties for overflow as a result of missed collection shall be considered as follows: <br /> i. First five overflows that are a consequence of missed collections in any calendar month,no <br /> charge, <br /> ii. Next five overflows that are a consequence of missed collection, $50 per overflow(one <br /> overflow per site,regardless of number of materials overflowing)where the overflow is not <br /> cleaned up by 5:00 PM of the working day following written or faxed notification of <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.