Browse
Search
Agenda - 09-18-2001 - 8h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 09-18-2001
>
Agenda - 09-18-2001 - 8h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2012 12:15:20 PM
Creation date
10/29/2012 12:15:19 PM
Metadata
Fields
Template:
BOCC
Date
9/18/2001
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8h
Document Relationships
Minutes - 09-18-2001
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
ORD-2001-027 Planning - Orange County Stormwater Program Regulatory Enhancements for Lands Within the Neuse River Basin
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 c <br /> buffer, bridges, greenway trails, utilities, ponds, and road crossings. <br /> The attached Stormwater Ordinance amendments conform to requirements by NCDENR- Division <br /> of Water Quality, the Environmental Management Commission, and the NC Administrative Code, <br /> rules 15A 2B .0233 and .0241. These changes are the result of the State Attorney General's office <br /> extensive review, and NCDENR-DWQ staff enforcement experience. <br /> Request <br /> To adopt the amendments to the Orange County Stormwater Program and Ordinance for Lands <br /> within the Neuse River Basin. <br /> The deadline for submittal to the State in order to be placed on the October agenda of the <br /> Environmental Management Commission is September 15th so a tentative request will be made <br /> pending the outcome of the September 18, 2001 BOCC meeting. <br /> Location <br /> Upper Neuse River Basin within Orange County which includes Upper and Lower Eno, Little River <br /> and Flat River watershed basins. <br /> Existing and Proposed Conditions <br /> Existing: <br /> Orange County Stormwater Program for Lands within the Neuse River Basin in place without <br /> implementation or enforcement for Sections 3 and 4, Riparian Buffers. Erosion and Sedimentation <br /> Control, and Water Supply Watershed Requirements, and Subdivision buffer requirements currently <br /> in place. <br /> Proposed: <br /> • change in the disputes and variance process for the Stormwater Ordinance to parallel the <br /> State's process (page 14) <br /> • change in Section 4.F.2 from citing 15A NCAC 2B .0242 to incorporating .0242 word for word <br /> per the State Attorney General's office. (page 16) <br /> • change in civil penalty to add phrase 'per day' (page 31) <br /> • change in criminal penalty to conform with state administrative code (page 32) <br /> • semantic revisions involving the definition of the word County, the use of words such as 'rule', <br /> etc. <br /> Development Process. Schedule, and Action <br /> • Public Hearing held May 22, 2000 with no speakers from the public. <br /> • Forwarded Draft Program to NCDENR-DWQ upon approval by the Board. <br /> • Approved by DWQ, the Environmental Management Commission-Water Quality Committee on <br /> October 11, 2000. <br /> • Adoption of Program and Ordinance on December 4, 2000 per the Board's approval. <br /> • December 2000 through March 2001: implement Phase 1 of the Program and Ordinance with <br /> the focus being on Nitrogen Reduction standards and measures, and Public Education and <br /> Outreach. <br /> • Meetings regarding the legal requirements for the granting of delegated authority between <br /> County Staff, Harmony Wayland, Division of Water Quality Staff, and the Attorney General's <br /> office. <br /> • Public hearing held August 27, 2001 with no speakers from the public. <br />
The URL can be used to link to this page
Your browser does not support the video tag.