Orange County NC Website
(Underground Distribution Installation PlanjNC&SC)Continued) g <br /> 2. Preliminary engineering studies are necessary to determine the approximate costs of replacing overhead with <br /> underground facilities. Persons requesting replacement of such facilities shall pay,prior to commencement of <br /> such studies by the Company, a good faith, nonrefundable deposit in an amount of$100 for each 600 feet of <br /> front lot lines for residential development studies,and,for studies of all other service areas,the estimated cost of <br /> the preliminary engineering study.If the replacement is undertaken following completion of such studies,actual <br /> costs,including preliminary engineering studies,will be charged and credit will be given for the estimated costs, <br /> or deposit,which was advanced. <br /> 3. The Company need not replace existing overhead systems with underground facilities,except individual services <br /> from pole to residence,unless at least one block or 600 feet of front lot line is involved,whichever is less. <br /> 4. All customers served directly from the specific section of line or in the area to be replaced with underground <br /> facilities shall agree to the conditions outlined for replacement of overhead facilities. <br /> 5 Owners shall arrangge the wiring of their structures to receive underground service at meter locations which allow <br /> unimpeded installation of the underground service facilities. <br /> ESTIIAATES <br /> Estimates of the cost of the underground and overhead facilities for the purpose of determining the amount of the <br /> contribution-in-aid-of-construction will be in accord with the Company's current construction design practices and <br /> shall be based upon the equivalent conductor and transformer capacity required for the electrical load specified by the <br /> owner. <br /> GENERAL PROVISIONS <br /> 1. Facilities associated with an underground distribution system, other than the conductors,may be installed above <br /> or below ground level as determined solely by the Company in accord with•the current construction design <br /> practices of the Company. <br /> 2. The Company will normally not provide underground service at secondary voltages above 480 volts. a.. <br /> 3. The Company will provide service to a single transformer using a loop system design at the request of the owner <br /> who desires to have a loop system installed and makes a payment equal to the estimated cost of the additional <br /> "? facilities in excess of the radial extension facilities. <br /> �== 4. Existing overhead distribution bulk feeders will remain installed overhead unless the owner desires to have them <br /> installed underground. New bulk feeders necessary to serve a new underground residential subdivision will be <br /> installed overhead unless the owner desires to have them installed underground,and makes a contribution-in-aid- <br /> of-construction equal to the estimated cost difference between underground and overhead facilities. If it is <br /> necessary to extend a distribution bulk feeder through an existing underground residential development,it will be <br /> installed underground at Company expense. <br /> 5. New subfeeders necessary to serve a new underground subdivision or development will be installed underground <br /> inside such areas at no charge.New subfeeders outside such areas normally will be installed overhead,unless the <br /> owner desires to have them installed underground and makes a payment equal to the estimated cost difference. <br /> 6. Developments shall be divided into established and defined lots.For purposes of determining service categories, <br /> the average size of lots shall be expressed in square feet. <br /> 7. Prior to the installation of the underground distribution system by the Company, the final grade levels of the <br /> building sites shall be established by the owner.The building construction program shall be coordinated with the <br /> installation of underground electrical facilities to permit unimpeded access of the Company's equipment to the <br /> installation sites;to allow installation of underground facilities at proper depth and before streets,curbs or other <br /> obstructions are installed; and to eliminate dig-ins to the underground electrical facilities after installation. <br /> Should streets, curbs or other obstructions be present prior to installation of underground facilities,resulting in <br /> additional expense to the Company,payment for these additional expenses shall be made to the Company by the <br /> owner. Should established lots or final grade levels change after installation of underground electrical facilities <br /> has begun, or if installation of electrical facilities is required by the owner before final grades are established, <br /> and either of these conditions results in additional expenses to the Company, payment for these additional - <br /> expenses shall be made to the Company by the owner. <br /> 8. Should existing sidewalks, septic tank systems, fuel tanks, other utility line, or other man-made obstructions <br /> result in additional expenses to the Company,payment for same will be made by the owner. <br /> 9. Actual costs brought about in connection with the compliance of special requirements, if any, of <br /> municipalities, State and Federal highway agencies or departments regarding the breaking of pavement, <br /> ditching backfilling,and other related conditions,will be paid by the owner. <br /> (Over) (Page 3 of 4) <br />