2001 NS Manager - Duke Power . Electrical Easement for Fairview Park Community Policing Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2001
>
2001 NS Manager - Duke Power . Electrical Easement for Fairview Park Community Policing Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2012 3:58:05 PM
Creation date
10/26/2012 11:27:54 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2001
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
8b
Document Relationships
Agenda - 12-11-2001-8b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 12-11-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DUKE POWER CONRIANY 6 . <br /> UNDERGROUND DISTRIBUTION <br /> ,.. � INSTALLATION PLAN <br /> AVAILABILITY <br /> Normally, the Company's distribution and service facilities are installed above-ground on poles, towers, or other <br /> fixtures. At the request of an owner (including builders, developers, contractors and customers), the Company will <br /> install,own and maintain underground facilities under the terms and conditions of this Plan. <br /> At the determination of the Company,in those areas where it is physically or economically infeasible, or impractical, <br /> to place facilities above-ground due to structural or geographical congestion or load density,the Company may place <br /> its facilities underground at its own option and expense. <br /> DEFINITIONS <br /> The term "overhead facilities" as used in this Plan, means an electrical distribution system having all components <br /> installed above ground level. <br /> The term"underground facilities" as used in this Plan,means an electrical distribution system having some, or all, <br /> components installed below ground level <br /> A"bulk feeder"is a conductor system transporting the total electrical requirements of a large area from a substation <br /> or other supply point into such an area, which may consist of several residential developments and other loads. A <br /> "subfeeder"is a conductor system branching off of the bulk feeder to supply the requirements of a certain portion of <br /> the area The subfeeder may terminate in a given development,but the bulk feeder may,or may not,pass through the <br /> development to serve adjacent areas. <br /> A"primary voltage loop system"of conductors provides multiple supply routes to more than one transformer serving <br /> the load requirements. A "primary voltage radial extension" of underground facilities consists of a single supply `Y <br /> route to a single transformer serving the load requirements. <br /> "Secondary facilities"consist of equipment necessary to provide secondary voltage from the Company's transformer <br /> to the owner's delivery point."Primary facilities"consist of equipment,including transformation, to supply primary <br /> voltage into the owner's property or development. <br /> "Cost difference"is the amount by which the estimated cost of underground facilities exceeds the estimated cost of <br /> comparable overhead facilities,but not less than zero. <br /> "Loss due to early retirement"is the original cost of the facilities involved,less accrued depreciation, less salvage, <br /> plus the cost of removal. <br /> SERVICE CATEGORIES <br /> L <br /> RESIDENTL 1,SERVICE <br /> At the request of an owner, the Company will install, own and maintain underground facilities for service to single <br /> residences, apartments, condominiums, and manufactured homes following these Plan provisions. Any charge to the <br /> owner is for the cost difference of the necessary underground facilities requested and is non-refundable. The signed <br /> agreement with the owner for underground service shall specify the payment arrangements. <br /> A.Permanent Residences <br /> Residences which are to be permanent customer locations on a residential rate schedule of the Company will be served <br /> from underground facilities as shown below. <br /> (1)New Service Installations Located in New <br /> Developments <br /> Service to new residences on lots averaging an acre <br /> (43,560 sq. L),or less No Charge <br /> Service to new residences on lots averaging more No charge except for cost difference of new primary <br /> than one acre facilities exceeding 300 feet per lot. <br /> (Over) (Page 1 of 4) <br />