Orange County NC Website
3 <br /> Task 3: Detailed Technical Specifications <br /> A detailed specification of exact requirements must be developed. The <br /> specification must include responsibilities specifically related to the Deeds system <br /> vendor and responsibilities specifically related to the Universe modification <br /> vendor. Included in this proposal is a proposed outline of the detailed <br /> specification. <br /> Delivered Result: Technical specifications to be used for quote and <br /> subsequent performance of work by both Deed system vendor(s) and <br /> Universe system vendor(s). <br /> Billing hours to complete: 40 <br /> Contractual details for the actual performance of the technical work, including selection of <br /> vendor(s), business relationship(s) and schedule are not included in this specification. <br /> The estimate to complete this work is three weeks (120 hours)to be performed over a four- <br /> week period. Hours will be billed at our standard billing rate of$75/hour. <br /> I look forward to continuing to work with you on this project. <br /> Mike Lee <br /> Lee Software Development <br /> 147 Fearing Place <br /> Manteo, NC 27954 <br /> (252)475-1424 <br />