Browse
Search
Agenda - 10-25-2012 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 10-25-2012 - Work Session
>
Agenda - 10-25-2012 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 12:06:14 PM
Creation date
10/24/2012 4:45:05 PM
Metadata
Fields
Template:
BOCC
Date
10/25/2012
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 10-25-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> I <br /> o Cellular tower to improve area phone service ' <br /> • Additional uses the group indicated would be preferred included: <br /> o Some type of room with computers and internet access (as the library ' <br /> branch used to have). , <br /> o Some classrooms - could a few of them be retained? ' <br /> o Support for an Emergency Services base station - as long as it did not ' <br /> take space away from the proposed center <br /> • There was a question about the naming of the facility and the future of the ' <br /> new playground built with the park (if the classroom wings were taken <br /> down). <br /> • There was interest in having residents serve on an informal design and , <br /> review advisory group. Eight members volunteered to serve on this informal ' <br /> group to help advise on designing the new building as it moves forward. �' <br /> Conclusions ' <br /> 1. Staff will make a summary of this meeting and the group's , <br /> recommendations. <br /> 2. The recommendations, along with the proposal to create the informal design <br /> and review advisory group, will be shared with the Board of County <br /> Commissioners at a worksession this fall. ' <br /> 3. Once direction has been received from the Board, a proposed course of ' <br /> action would be developed for Board approval. ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.