Browse
Search
2001 NS Housing - Taylor Home Improvements Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2001
>
2001 NS Housing - Taylor Home Improvements Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2012 8:46:59 AM
Creation date
10/24/2012 1:48:05 PM
Metadata
Fields
Template:
BOCC
Date
10/16/2001
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8g
Document Relationships
Agenda - 10-16-2001-8g
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 10-16-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mable Burnett 7 <br /> 114 Glosson Cir. Carrboro <br /> 967-4583 <br /> September 18, 2001 <br /> LAUNDRY ROOM: <br /> 1. Remove the floor covering to the joists <br /> 2. Replace two floor joists with likesize lumber. <br /> 3. Replace approx. eight IS of sill plate. <br /> 4. Install 3/4 inch CD plywood subfloor, 1/2inch AC plywood finish floor. <br /> Prepare the plywood.for vinyl. <br /> 5. Install 31/4 inch matching baseboard. <br /> 6. Install a six panel,metal insulated door unit with lockset and deadbolt to be keyed <br /> the same as the front door. Install a wide view peephole. <br /> 7. Install an aluminum storm door with pneumatic clousrer and vinyl sweep. Door to <br /> have a self-storing glass and screen,push button lock and key and lifetime <br /> warranty. <br /> RIGHT/FRONT BEDROOM: <br /> 1. Install a wood, door unit and privacy lockset <br /> BATH: <br /> 1. Remove the floor covering to the floor joists,the wall covering to the studs. <br /> Remove the closet framing. <br /> 2. Install%inch CD plywood subfloor and 1/2inch AC plywood finish floor. <br /> Prepare the plywood for vinyl. <br /> 3. Install 31/4 inch matching baseboard. <br /> 4. Insulate the exterior wall to R-15. <br />
The URL can be used to link to this page
Your browser does not support the video tag.