Browse
Search
2001 NS Housing - Taylor Home Improvements Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2001
>
2001 NS Housing - Taylor Home Improvements Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2012 8:46:59 AM
Creation date
10/24/2012 1:48:05 PM
Metadata
Fields
Template:
BOCC
Date
10/16/2001
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8g
Document Relationships
Agenda - 10-16-2001-8g
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 10-16-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mable Burnett 6 <br /> 114 Glosson Cir. Carrboro <br /> 967-4583 . <br /> September 18, 2001 <br /> 2. Install vinyl floor covering in the bath,kitchen and laundry room.Install <br /> shoemold and metal trim.Vinyl to cost not less than$14/yd. <br /> LIVING ROOM: <br /> 1. Install a six panel,metal insulated door unit with lockset and deadbolt to be keyed <br /> the same.Install a wide view peephole. <br /> 2. Install aluminum over wood core storm door with pneumatic closurer and vinyl <br /> sweep.Door to have a self-storing glass and screen,push button lock and key and <br /> a lifetime warranty. <br /> 3. Remove the masonry thimble on the gable wall. Install matching sheetrock. Tape <br /> and finish the sheetrock smooth. <br /> KITCHEN: <br /> 1. Remove the cabinets and floor covering to the joists. <br /> 2. Replace three floor joists with likesize lumber. <br /> 3. Replace approx. 1011 of sill plate. <br /> 4. Install matching plywood for finish and subfloor. Install Y4"luan plywood. <br /> Prepare the floor for vinyl. <br /> 5. Install factory finish cabinets with wood fronts.Install a formica counter top with <br /> a rolled backsplash. <br /> 6. Install 31/4 inch matching baseboard. <br />
The URL can be used to link to this page
Your browser does not support the video tag.