Browse
Search
ORD-2001-027 Planning - Orange County Stormwater Program Regulatory Enhancements for Lands Within the Neuse River Basin
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2001
>
ORD-2001-027 Planning - Orange County Stormwater Program Regulatory Enhancements for Lands Within the Neuse River Basin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:42:26 PM
Creation date
10/23/2012 9:04:04 AM
Metadata
Fields
Template:
BOCC
Date
9/18/2001
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8h
Document Relationships
Agenda - 09-18-2001 - 8h
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 09-18-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
030 <br /> Section 9 BMP Construction <br /> A. Total Nitrogen Removal Rates <br /> Each BMP receives an assigned TN (total nitrogen)removal rate. <br /> BMP Type TN Removal Rate Appropriate Design Standards <br /> Wet detention ponds 25% NC and MD Design Manuals <br /> Constructed wetlands 40% NC and MD Design Manuals <br /> Open channel practices 30% NC and MD Design Manuals <br /> Riparian buffers 30% Orange Co. Buffer Standards <br /> Vegetated buffer strips with 20% NC and MD Design Manuals <br /> level spreader <br /> Bioretention 25% NC and MD Design Manuals <br /> Sand filters 35% NC and MD Design Manuals <br /> Other BMPs varies subject to Orange County and <br /> NCDENR-DWQ approval <br /> 1. If more than one BMP is installed in series on a development,then the <br /> removal rate shall be determined through SERIAL rather than additive <br /> calculations. <br /> a) Example: <br /> If a wet detention pond discharges through a riparian buffer,then the TN <br /> removal rate would be 47.5%. This number is reached by assuming that <br /> the pond removes 25%of the TN and discharges 75%into the riparian <br /> buffer. The buffer then removes 30%of the nitrogen discharged by the <br /> pond, which is 22.5%. This totals 47.5% (25%+22.5%=47.5%). <br /> Theremoval rate is NOT 25%plus 30%. <br /> B. Surety <br /> The financially responsible party may be required to file with Orange County an <br /> improvement security,performance bond or letter of credit in the form of an escrow <br /> account or other instruments satisfactory to the County attorney in the amount deemed <br /> sufficient by the County to cover all costs of repairing or installing the required <br /> Permanent BMPs according to requirements of this Ordinance, and the approved <br /> Stormwater Management Plans. The amount of such surety requirement shall be <br /> determined by the County. Such surety shall be valid until the work is completed in <br /> accordance with the Stormwater Management Plan and until same is released by the <br /> County. Applicable surety shall be forfeited upon violation of this Ordinance and shall be <br /> used to establish protective cover on the site,to control the velocity of runoff, and/or <br /> prevent off-site nitrogen export. Any monies in excess of the cost of providing protective <br /> measures shall be refunded to the applicant. Surety shall be released when the County has <br /> certified that the requirements of this Ordinance have been met. Surety amounts will be <br /> determined by rates set in the Orange County Planning Fee Schedule. <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.