Browse
Search
ORD-2001-027 Planning - Orange County Stormwater Program Regulatory Enhancements for Lands Within the Neuse River Basin
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2001
>
ORD-2001-027 Planning - Orange County Stormwater Program Regulatory Enhancements for Lands Within the Neuse River Basin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:42:26 PM
Creation date
10/23/2012 9:04:04 AM
Metadata
Fields
Template:
BOCC
Date
9/18/2001
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8h
Document Relationships
Agenda - 09-18-2001 - 8h
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 09-18-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
engineer shall prepare the plan with the Engineer's Certification of Stormwater <br /> Management as shown in Appendix 3 affixed, signed, sealed and dated. <br /> E. Fees <br /> The Stormwater Management Plan Review Fee shall be paid at the time of submittal. The <br /> fee shall be based upon the current Orange County Planning Fee Schedule. <br /> F. Appeals <br /> Appeals of the Enforcement Officer's decision on a Stormwater Management Plan shall <br /> be made to the Orange County Planning Director. If the Planning Director upholds the <br /> decision,the person shall be entitled to a public hearing if such person submits written <br /> demand for a hearing within 15 days after receipt of written notice of disapproval, <br /> modification,or conditions of approval. <br /> 1. Hearings held pursuant to this section shall be conducted by the Orange <br /> County Planning Board within 30 days after receipt of written demand for such <br /> hearing made by the person submitting the plan <br /> 2. The Orange County Planning Board shall make recommendations to the <br /> Board of Commissioners of Orange County within 30 days after the date of <br /> hearing on such erosion control plan. <br /> 3. The Board of Commissioners of Orange County will render its final decision <br /> on any erosion control plan upon which a hearing is requested within 30 days of <br /> receipt of the recommendations, from the agency conducting the hearing. <br /> Section 8 Permanent Nitrogen Export Reduction Best Management Practices <br /> A. Permanent On-site Nitrogen Export Reduction BMPs <br /> The following on-site BMPs may be utilized for reducing nitrogen from new <br /> developments: <br /> 1. Wet detention ponds <br /> . 2. Constructed wetlands <br /> 3. Open channel practices <br /> 4. Riparian buffers <br /> 5. Bioretention <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.