Browse
Search
ORD-2001-027 Planning - Orange County Stormwater Program Regulatory Enhancements for Lands Within the Neuse River Basin
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2001
>
ORD-2001-027 Planning - Orange County Stormwater Program Regulatory Enhancements for Lands Within the Neuse River Basin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:42:26 PM
Creation date
10/23/2012 9:04:04 AM
Metadata
Fields
Template:
BOCC
Date
9/18/2001
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8h
Document Relationships
Agenda - 09-18-2001 - 8h
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 09-18-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
413 <br /> Exempt Allowable Allowable Prohibited <br /> with <br /> Mitigation <br /> Overhead electric utility lines: <br /> • Impacts other than perpendicular crossings in Zone 2 X <br /> only <br /> • Impacts other than perpendicular crossings in Zone 1 1,20 X <br /> • Perpendicular crossings that disturb equal to or less than X <br /> 150 linear feet of riparian buffer 1 <br /> • Perpendicular crossings that disturb greater than 150 X <br /> linear feet of riparian buffer 1,2 <br /> Periodic maintenance of modified natural streams such as <br /> canals and a grassed travelway on one side of the surface X <br /> water when alternative forms of maintenance access are not <br /> practical <br /> Provided that,in Zone 1,all of the following BMPs for overhead utility lines are used. If all of these BMPs are not <br /> used,then the overhead utility lines shall require a no practical alternative evaluation by the Division. <br /> • A minimum zone of 10 feet wide immediately adjacent to the water body shall be managed such that only vegetation <br /> that poses a hazard or has the potential to grow tall enough to interfere with the line is removed. <br /> • Woody vegetation shall be cleared by hand. No land grubbing or grading is allowed. <br /> • Vegetative root systems shall be left intact to maintain the integrity of the soil. Stumps shall remain where trees are <br /> cut. <br /> • Rip rap shall not be used unless it is necessary to stabilize a tower. <br /> • No fertilizer shall be used.other than a one-time application to re-establish vegetation. <br /> • Construction activities shall minimize the removal of woody vegetation,the extent of the disturbed area,and the time <br /> in which areas remain in a disturbed state. <br /> • Active measures shall be taken after construction and during routine maintenance to ensure diffuse flow of <br /> stormwater through the buffer. <br /> • In wetlands,mats shall be utilized to minimize soil disturbance. <br /> Z Provided that poles or towers shall not be installed within 10 feet of a water body unless the Division completes a no <br /> practical alternative evaluation. <br /> 3 Perpendicular crossings are those that intersect the surface water at an angle between 75°and 105°. <br /> . 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.