Browse
Search
Minutes - 20061102
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2000's
>
2006
>
Minutes - 20061102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2008 1:50:11 PM
Creation date
8/13/2008 2:45:42 PM
Metadata
Fields
Template:
BOCC
Date
11/2/2006
Document Type
Minutes
Document Relationships
Agenda - 11-02-2006 - Agenda
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-10a
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-5c
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-5d
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-5e
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-5f
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-5g
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-5h
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-5i
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-5j
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-5k
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-5l
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-5m
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-6a
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-7a
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-7b
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-8a
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-9a
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-9b
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-9c
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-9d
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
Agenda - 11-02-2006-9e
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- Projected needs through 2020 <br />- reflected significant overcrowding in several areas <br />• The Study, updated in late 2004 reflected no change in the overcrowded conditions <br />• BOCC to receive study update information November 9, 2006 <br />A Potential Space Solution <br />• Developer presented option to: <br />- Add approximately 93,000 square feet of space to County's downtown campus <br />- Add much needed parking far Downtown <br />The Project <br />• Phase I: Two-story public library (23,454 sf) <br />• Phase II: Three-story office building (46,716 sf} <br />• Phase III: Parking facility <br />- Total parking 335 spaces +/- <br />The Library <br />Office Building <br />The Gateway Center <br />(Auxiliary Project} <br />• Weaver Street Market-first floor {11,423 sf) <br />• County offices-floors two and three (22,846 sf} <br />The Gateway Center <br />Parking <br />• Deck capacity ~ 335 spaces <br />- 175 spaces in deck for County use <br />- 160 spaces retained by developer for public parking <br />• Additional surface parking around buildings <br />The Site <br />• 3.35 (approx} acres <br />• Old Southern States site on Margaret Lane <br />• Gateway Center site on Churton Street <br />• Additional parcels make up parking deck site <br />Environmental Considerations <br />• Designed with walkability in mind <br />- To restaurants, shops, other County offices, etc. <br />• Stormwater control system on site to: <br />- Detain Stormwater run-off to preconstruction conditions <br />- Filter and stare stormwater <br />• Utilize multi-story buildings to minimize land disturbance <br />
The URL can be used to link to this page
Your browser does not support the video tag.