Browse
Search
2001 NS Purchasing - Reece, Noland, McElrath Award of Bid, Contract Approval for Whitted HVAC Consulting Engineer
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2001
>
2001 NS Purchasing - Reece, Noland, McElrath Award of Bid, Contract Approval for Whitted HVAC Consulting Engineer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2012 9:05:07 AM
Creation date
10/22/2012 12:16:47 PM
Metadata
Fields
Template:
BOCC
Date
9/4/2001
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
9a
Document Relationships
Agenda - 09-04-2001-9a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 09-04-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
\ 7 <br /> litigation,then all of our costs associated with collection are recoverable_ Tf payments are <br /> withhold or disputed,we retain the right to stop work until account is current. If there is a project <br /> sign and building plaque,Reece,Noland&McElrath Engineers will be appropriately listed. <br /> Document preparation and distribution for bidding,as welt as expedited shipping requested by <br /> Owner,will be treated as reimbursables. <br /> The basic HVAIC system proposed is variable air volume(VAV)with terminal reheat,air <br /> cooled water chiller, and natural gas boilers, as recommended by the Robson& Woese, Inc. <br /> Study. Enhancemcnt/modifications to this basic system will be considered as budget supports, for <br /> improved environmental sustainrbility,comfort, and indoor air quality. Possibilities include heat <br /> recovery,water cooled chiller with hydronic economizer.variable speed pumping,demand control <br /> ventilation, and increased efficiency boilers. <br /> Electrical connections to new HVAC equipment will be designed based on being supplied <br /> from existing building service. New building lighting,systems wilt be specified if ce diogs are <br /> removed, which is expected. New tight fixtures will typically be T.g fluorescent fixtures with <br /> electronic ballasts,with some HID fixtures in the Library. Tliis should improve the enirrgy <br /> efficiency of the facility significantly,in addition to reducing the cooling load. <br /> New lay-in ceilings and new suspension systems will most likely be specified,as <br /> expectations are that mechanical work in the above ceiling cavities wilt require almost complete <br /> removal of existing ceilings. <br /> We have included no services related to identification or removal of hazardous wastes <br /> (asbestos,lead based paint, etc.)from the facility, as our understanding is that the buildings have <br /> been inspected and no such materials have been identified. If such materials are encountered <br /> during construction,it will be the responsibility of the Owner to have such materials removed. <br /> If you have any questions or your needs differ from the woo of work I have assumed and <br /> quoted above,please let me know. <br /> Yours very truly, <br /> REECE,NOLAND&McBLRATH,INC. <br /> Stephan C. Kaufman,P.B. <br /> Accepted By: ----. <br /> Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.