Orange County NC Website
\ 7 <br /> litigation,then all of our costs associated with collection are recoverable_ Tf payments are <br /> withhold or disputed,we retain the right to stop work until account is current. If there is a project <br /> sign and building plaque,Reece,Noland&McElrath Engineers will be appropriately listed. <br /> Document preparation and distribution for bidding,as welt as expedited shipping requested by <br /> Owner,will be treated as reimbursables. <br /> The basic HVAIC system proposed is variable air volume(VAV)with terminal reheat,air <br /> cooled water chiller, and natural gas boilers, as recommended by the Robson& Woese, Inc. <br /> Study. Enhancemcnt/modifications to this basic system will be considered as budget supports, for <br /> improved environmental sustainrbility,comfort, and indoor air quality. Possibilities include heat <br /> recovery,water cooled chiller with hydronic economizer.variable speed pumping,demand control <br /> ventilation, and increased efficiency boilers. <br /> Electrical connections to new HVAC equipment will be designed based on being supplied <br /> from existing building service. New building lighting,systems wilt be specified if ce diogs are <br /> removed, which is expected. New tight fixtures will typically be T.g fluorescent fixtures with <br /> electronic ballasts,with some HID fixtures in the Library. Tliis should improve the enirrgy <br /> efficiency of the facility significantly,in addition to reducing the cooling load. <br /> New lay-in ceilings and new suspension systems will most likely be specified,as <br /> expectations are that mechanical work in the above ceiling cavities wilt require almost complete <br /> removal of existing ceilings. <br /> We have included no services related to identification or removal of hazardous wastes <br /> (asbestos,lead based paint, etc.)from the facility, as our understanding is that the buildings have <br /> been inspected and no such materials have been identified. If such materials are encountered <br /> during construction,it will be the responsibility of the Owner to have such materials removed. <br /> If you have any questions or your needs differ from the woo of work I have assumed and <br /> quoted above,please let me know. <br /> Yours very truly, <br /> REECE,NOLAND&McBLRATH,INC. <br /> Stephan C. Kaufman,P.B. <br /> Accepted By: ----. <br /> Date: <br />