Orange County NC Website
Eubanks Road User Energy Demands and Energy Balance graphs <br />Eubanks Road System Components <br />- LFG Extraction Wells and Collection System (South Eubanks MSWLF) <br />- Blower and Flare Station (South Eubanks MSWLF) <br />- Moisture Removal and Compressor Station (South Eubanks MSWLF} <br />- Gas Transmission Line (Landfill to School} <br />- Fuel Conditioning and Microturbine (School} <br />Eubanks Road Economic Evaluation <br />Energy Sales and Avoided Costs $168,100 <br />Energy Production Costs $276,700 <br />Renewable Energy Cost {$108,600) <br />Eubanks Road Status <br />- Preliminary Economic Assessment <br />o Estimated Costs exceed Revenues and Avoided Costs ($108,600) <br />o Economics Negatively Impacted by Low Thermal Energy Demands of Primary <br />Users <br />Eubanks Road Key Action Items <br />- Refine Energy Demands <br />o Animal Shelter <br />o School <br />- Assess Economic Impact of Public/Private Partnership Options <br />o Maximize Green Power and Energy Credit Benefits <br />Energy Demand Comparison graph <br />Carolina North System Components <br />- LFG Extraction Wells and Collection System (North and South Eubanks MSWLFs} <br />- Blower and Flare Station (North and South Eubanks MSWLFs) <br />- Moisture Removal and Compressor Station (South Eubanks MSWLF} <br />- Gas Transmission Line {Landfill to Carolina North Campus} <br />- Fuel Conditioning and Microturbine {Carolina North Campus) <br />Carolina North Energy Summary <br />Carolina North Economic Evaluation <br />Energy Sales and Avoided Costs $507,400 <br />Energy Production Costs $506,700 <br />Renewable Energy Cast $0 <br />Carolina North Status <br />- Preliminary Economic Assessment <br />o Economically Viable - Breakeven given Current Assumptions <br />o Must Maximize Cogeneration Energy Production and Usage <br />o Delays in Carolina North Development Timeline Could Adversely Impact <br />Economic Feasibility <br />