Orange County NC Website
4 <br /> The document describing development restrictions shall be recorded with the <br /> Final Plat and state that the financial guarantee will not be released until the road <br /> construction has been certified by a North Carolina Professional Engineer. <br /> 2. An erosion control plan for construction of the roads shall be submitted by the <br /> applicant to the Orange County Erosion Control Division for review and approval <br /> prior to any land disturbing activity. <br /> 3. Approved street name signs shall be erected at the intersection of streets as <br /> required in Section IV-B-3-c-12 of the Orange County Subdivision Regulations. <br /> Evidence shall be submitted by the applicant that the sign is in place,or a copy of <br /> the receipt for purchase of the sign shall be submitted to the Planning Department <br /> prior to recordation of the final plat. <br /> 4. No lots shall receive access from Gold Mine Road(SR 1957). <br /> C. Land Use Buffers and Landscaping <br /> 1. Landscaping shall be installed or preserved as indicated on the approved <br /> landscape plan and shall be inspected and approved by the Planning and <br /> Inspections Department. <br /> 2. Provisions for protection of existing trees as shown on the approved landscape <br /> plan shall be included in a document describing development restrictions and <br /> requirements to be prepared by Planning Staff and recorded concurrently with the <br /> Final Plat. <br /> D. Drainage <br /> 1. Impervious surface data, as pursuant to Article 6.23.3c.I of the Zoning Ordinance <br /> shall be included in a document describing development restrictions and <br /> requirements to be prepared by Planning Staff and recorded concurrently with the <br /> Final Plat. The impervious surface limitations for each lot shall indicate whether <br /> the impervious surface includes or excludes one-half(112)of the road width in the <br /> calculations. <br /> 2. Locate drainage easements on the final plat as required following review and <br /> approval of the Erosion Control Plan. <br /> 3. Drainage culverts shall be sized and located as required by the Orange County <br /> Erosion Control Officer. <br /> 4. A stream buffer shall be provided along the stream as indicated on the Preliminary <br /> Plan. The stream buffer shall be shown on the final plat. <br />