Browse
Search
Agenda - 08-30-2012 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 08-30-2012 - Work Session
>
Agenda - 08-30-2012 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 12:31:46 PM
Creation date
10/17/2012 12:17:32 PM
Metadata
Fields
Template:
BOCC
Date
8/30/2012
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes 08-30-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Assessment of Emergency Medical Services 86 <br /> DRAFT REPORT and 911/Communications Center Operations Study <br /> SECTION 5-PROBABLE COSTS <br /> EMERGENCY MEDICAL SERVICES <br /> Issue: EMS Base Facilities <br /> RECOMMENDATIONS <br /> 8 Conduct detailed Space Needs Assessment <br /> 9 Identify minimum of nine (9) strategic locations <br /> 10 Purchase identified site and/or building <br /> 11 Procure base design & construction services <br /> 12 Construction; nine (9) EMS Bases <br /> REC Personnel Equipment Prof.Services Construction Other Total <br /> 8 n/a n/a $ 12,000 n/a TBD $ 12,000 <br /> 9 n/a n/a n/a n/a n/a $ - <br /> 10 n/a n/a n/a n/a TBD TBD <br /> 11 n/a TBD $1,620,000 n/a TBD $ 1,620,000 <br /> 12 n/a TBD n/a $8,064,000 n/a $8,064,000 <br /> Notes: <br /> Rec 8. Prof. Services- Estimated contracted cost to provide a Space Needs Assessment to address and <br /> document building and site requirements for an EMS base facility. <br /> Rec 11. Professional Services-Estimated total cost for planning & design services for nine (9) EMS base <br /> facilities; assumes design for each facility is contracted for as a single project. <br /> Rec 12. Construction- Estimated cost of construction for nine (9) EMS base facilities bid and contracted <br /> for as nine (9) separate projects; single facility construction cost based on a current NC County project <br /> in final stages of design @ 5,000 square feet x$180/square foot for pre-engineered steel building. <br /> Solutions for Local Government,Inc. 84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.