Browse
Search
Minutes 08-30-2012
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2012
>
Minutes 08-30-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2015 11:05:42 AM
Creation date
10/17/2012 11:20:14 AM
Metadata
Fields
Template:
BOCC
Date
8/30/2012
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 08-30-2012 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 08-30-2012 - Work Session
Agenda - 08-30-2012 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 08-30-2012 - Work Session
Agenda - 08-30-2012 - 2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 08-30-2012 - Work Session
Agenda - 08-30-2012 - 3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 08-30-2012 - Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Frank Clifton said that on September 11 th the Council of State will meet about the <br /> County's request for a long-term lease on property for a future jail site. He said that additional <br /> jail space is needed for female inmates and alternative programs. <br /> Chair Pelissier said that she would hope that the Sheriff and everyone in the criminal <br /> justice systems will be involved in the creation of a new jail and the County needs to look at <br /> this and alternative programs simultaneously. <br /> 2. Draft Comprehensive Assessment of Emerqency Medical Services and 911/ <br /> Communications Center Operations Study <br /> Michael Talbert said that the County Commissioners will be receiving a final draft <br /> Comprehensive Assessment of Emergency Medical Services and 911/ Communications <br /> Center Operations Study. The County Commissioners approved this in December of 2011 and <br /> it has taken a little over six months to complete. It has been thoroughly vetted through the <br /> Emergency Services Work Group. Steve Allan, from Solutions for Government, was present to <br /> give an overview of the report. <br /> Steve Allan made a PowerPoint presentation. The call volume in 2011 was 10,719, <br /> which was an increase from 10,420 in 2010. The primetime of the day for calls is from 9:00 <br /> a.m. to 9:00 p.m. <br /> He explained the turn-out time and the travel time, which total the response time. <br /> Regarding the Emergency vs. Non-Emergency Response Times, he explained that Emergency <br /> is a response with lights and sirens and Non-Emergency has no lights or sirens. The Average <br /> Event Duration Time is the time it takes for the vehicle to respond to an emergency, transport <br /> the patient, and be ready to respond again. The increase in this is a combination of the travel <br /> distance and the backup in the emergency vehicles. <br /> The issues of concern are: Availability of Ambulances, Response Times, and EMS <br /> Facilities. <br /> Availability of Ambulances <br /> During 2011 ambulances were directed to "MOVE" 2,360 times from their identified <br /> staging area or location to another point in the County because: <br /> a. The number of ambulances immediately available was down to one (1) and the <br /> subject ambulance was directed to move to a location (typically) near the center of <br /> the County in anticipation of being able to respond in any direction the call may <br /> direct. <br /> or <br /> b. In tracking the status of multiple ambulances, the Communications Center and/or <br /> EMS Supervisor(s) noted significant area gaps in coverage and redirected <br /> movement of ambulance(s) accordingly. <br /> Steve Allan said that moving ambulances this many times is significant. <br /> Response Time <br /> "The time from the initial alert or announcement by the Communications Center of the <br /> reported emergency, to the time that the service vehicle and appropriate personnel <br /> arrive on the scene." <br />
The URL can be used to link to this page
Your browser does not support the video tag.