Browse
Search
Minutes 08-27-2012
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2012
>
Minutes 08-27-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2015 11:05:08 AM
Creation date
10/17/2012 10:31:49 AM
Metadata
Fields
Template:
BOCC
Date
8/27/2012
Meeting Type
Public Hearing
Document Type
Minutes
Document Relationships
Agenda - 08-27-2012 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 08-27-2012 - Quarterly Public Hearing
Agenda - 08-27-2012 - C1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 08-27-2012 - Quarterly Public Hearing
Agenda - 08-27-2012 - C2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 08-27-2012 - Quarterly Public Hearing
Agenda - 08-27-2012 - C3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 08-27-2012 - Quarterly Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2, which is a vicinity map created by staff is on page 150. Attachment 3 contains <br /> staff inemorandum from Orange County Solid Waste and Orange County Health Department. <br /> Attachment 4 is a fiscal analysis that we produced outlining the anticipated costs to service the <br /> proposed neighborhood and what monies the County could expect to receive from this project <br /> and if it is developed. Attachment 5 is notes of the neighborhood information meeting, which we <br /> are going to discuss in the general abstract. Attachment 6 is the Finding of No Significant <br /> Environmental Impact statement completed after County staff determined the project would not <br /> have any significant impacts on this and surrounding property. Finally we have the notification <br /> certification that we typically provide for these types of projects outlining our compliance with <br /> established notification requirements. <br /> As detailed on pages 4 and 5 of your abstract, the applicant is proposing a conventional <br /> subdivision on a parcel of property located in the Rural Buffer Zoning District. As we articulate <br /> in our abstract, this particular parcel of property is located in the rural portion of the County that <br /> is defined on our Growth Management System Map, and it is located within the Rural Buffer <br /> Rural Residential area as defined and noted within the Joint Land Use Plan that we have with <br /> the Towns of Chapel Hill and Carrboro. <br /> The next slide is a vicinity map with the location of the property as well as a brief overview of <br /> surrounding development. As you will note, on the map that we have provided we have a <br /> mobile home park to the south, the J&J Mobile Home Park. To the east of this property, we <br /> have Triangle Land Conservancy property. This area denoted in green is a conservation <br /> easement. You also have to the north a major subdivision with lots ranging from 2-3 acres in <br /> area. You have to the southwest of this property the Green Valley subdivision with lots ranging <br /> from 40,000 square feet to two acres in size. To the west you have lots essentially one acre in <br /> area. Across the road is the Blackwood Forest subdivision with lots approximately two acres in <br /> area. <br /> The project as we identified in the abstract, the applicant is proposing lots with a minimum of <br /> two acres in area. The overall density for this project is one dwelling unit for every two acres. <br /> The proposed roads for this project will be built to DOT standards, and it's the applicant's desire <br /> to turn the roads over to NCDOT for maintenance at the appropriate time. <br /> According to the site plan lots 1-22 are going to be served by on-site septic systems. The <br /> applicant is proposing that lots 23-26 be served by an off-site septic area. The site plan denotes <br /> that there will be a utility easement transferring the affluent just outside of the NCDOT right-of- <br /> way to the proposed off-site septic area. There will be individual septic sites for each of these <br /> lots and there will not be one giant septic system. The rationale for that is to ensure that all four <br /> lots don't expect problems if the septic system fails. There will be a 30-foot land use buffer <br /> around the perimeter of this project and there will also be a 75-foot land use buffer along Mt <br /> Sinai Road as required by the code. The applicant is proposing at this point in time to service <br /> the project with a community well. This is going to be located on a proposed open space lot. <br /> There is also proposed to be picnic, recreational center, for use by all of the residents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.