Orange County NC Website
Add Alternate#4: Planter in Northwest Comer, etc. +$ 2,800.00 <br /> -(Except as herewith amended: Instead of the planter in the Northwest Comer, contractor <br /> shall build a brick retaining wall from the comer of the Chapel Hill News Building and shall be <br /> aligned as shown on the STREETSCAPE IMPROVEMENTS PLAN included in the Plans and <br /> Specifications Documents for this project. The wall shall be identical in method of construction <br /> and materials to the existing planter wall in front of and attached to the Chapel Hill News <br /> Building, 505 West Franklin Street. The lighted bollard shall be constructed as specified,but <br /> located next to the end of this wall). This amendment shall change the price of Add Alternate#4 <br /> by: <br /> 1000.00 <br /> Parking Meter Revenue Reimbursement 2,500.00 <br /> Street Furniture Credit for Town supplying and installing benches and trash receptacles: <br /> -$ 6,300.00 <br /> $119,445.00 <br /> The originals of the specifications, schedules, drawings and other documents are on file in the <br /> office of the Architect, and true copies of which are attached hereto and made a part of this <br /> contract as if fully set forth herein, and in accordance with the directions(not inconsistent <br /> therewith) given from time to time during the construction by the Architect or such official or <br /> employee of the Town of Chapel Hill or COUNTY as the COUNTY may designate. <br /> The CONTRACTOR shall accept the prices specified in this Contract and in the proposal in full <br /> compensation and satisfaction for the performance of this Contract; and as a part of the <br /> consideration connected with the said work; and the CONTRACTOR shall be responsible for <br /> faithfully completing the whole work according to the Drawings and Specifications and the terms <br /> and conditions of this Contract. <br /> The work required by this Contract shall be commenced by the CONTRACTOR not later than the <br /> start date indicated on the Notice to Proceed, and the entire work shall be completed not later than <br /> 120 days after the start date of the Notice to Proceed. <br /> All work under this Contract shall be done and performed to the satisfaction of Orange County,or <br /> of such official or employee of Orange County as may be designated by the County, and such <br /> official or employee designated by the County shall in all cases of dispute determine the quantity, <br /> quality, acceptability and fitness of the work and materials and of the several portions thereof <br /> which are to be paid for under this Contract, and shall decide and determine all questions which <br /> may arise as to the measurements, lines, levels, and dimensions of the work, and all questions <br /> respecting the true construction, interpretation or meaning of the Drawings and Specifications. In <br /> case of dispute between the CONTRACTOR and said official or employee of the COUNTY, the <br /> decision and determination of the latter shall be taken and shall be final and conclusive. <br /> In consideration of the performance of this contract and the full completion of the work required <br /> of the CONTRACTOR by the terms and conditions of this Contract,the COUNTY agrees to pay <br /> FRANKLIN STREET POCKET PARK <br />