Browse
Search
2001 S Purchasing - Mellott Construction for Franklin Street Pocket Park $126,742
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2001
>
2001 S Purchasing - Mellott Construction for Franklin Street Pocket Park $126,742
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2012 3:55:50 PM
Creation date
10/17/2012 8:16:30 AM
Metadata
Fields
Template:
BOCC
Date
6/25/2012
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
9g
Document Relationships
Agenda - 06-25-2001-9g
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 06-25-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORIGINAL, SIGNATURES <br /> COPY W _1 c-f 4 <br /> NORTH CAROLINA DIST: <br /> ORANGE COUNTY "- <br /> CONSTRUCTION CONTRACT <br /> THIS CONTRACT,made and executed in triplicate this day of October, 2001,by and <br /> between ORANGE COUNTY,NORTH CAROLINA, a hereinafter <br /> designated as the "COUNTY", and: ham incorpc�re, a5vbdt�iSto„ <br /> 044hc;96+e of Nom► Ca.►ro4rna (`ih <br /> Mellott Construction <br /> hereinafter designated as the "CONTRACTOR": <br /> WITNESSETH: That pursuant to the provisions of Section 143-129 as amended, of the General <br /> Statutes of North Carolina,proposals were invited for the construction of the improvements <br /> hereinafter referred to, and all proposals having been duly opened and as provided by law, the <br /> Commisioners of Orange County at a meeting on the 2 day of .tune, ' 2001, <br /> awarded the contract for said construction to the aforesaid Contractor,the lowest responsible <br /> bidder, at the prices specified in the proposal, said proposal being a part of this Contract: <br /> NOW, THEREFORE, in consideration of the payments agreed to be made by the County <br /> hereinafter specified,the COUNTY and the CONTRACTOR agree as follows: <br /> (1) The CONTRACTOR, at his (its) own proper cost and expense and with skill and <br /> diligence, shall furnish all labor, tools,materials, and equipment and do all things <br /> necessary for the proper construction and completion as per the Drawings and <br /> Specifications: FRANKLIN STREET POCKET PARK <br /> (2) The CONTRACTOR shall strictly follow the said Project Manual, dated May 4, <br /> 2001, and Drawings dated 2-26-01, and December 2000 (for Streetscape <br /> Improvements Plan), and as amended by Addendums#1, #2, and#3, and as <br /> further amended below. <br /> All work described above shall be performed at the total bid price of: $119,445.00 <br /> As broken down into the following amounts: <br /> Original Section 1 Bid: $ 45,936.00 <br /> Original Section 2 Bid: $ 80,806.00 <br /> Original Total Bid : $ 126,742.00 <br /> Deduct Alternate#1: Smaller Tree Sizes -$ 6,598.00 <br /> Add Alternate#2: Retaining Wall @ Coldwell +$ 3,801.00 <br /> Add Alternate#3: Exterior Lighting Fixtures +$ 2,500.00 <br /> FRANKLIN STREET POCKET PARK <br />
The URL can be used to link to this page
Your browser does not support the video tag.