Orange County NC Website
Mr. Redfoot explained Option A and B also include the potential for an addition to the Seymour <br /> Center and to the Southern Human Services although they don't know the size or location at this time. In <br /> both options, they are calling for preserving the hardwoods in the southwest corner of the site. <br /> Mr. Redfoot then moved on to Option B (slide) and said it did a much larger job in terms of <br /> addressing the main entrance. They could use a major intersection and entrance change there to clarify <br /> getting into the site, more of a straight intersection, a T intersection into Homestead Road. The road <br /> would come straight into the Seymour Center and parking lot giving a clear identifiable parking lot and <br /> traffic access to that center. Then, coming off into another clear T intersection, they would swing the road <br /> all the way through the site, connect it with the Southern Human Services Center, bring it all the way <br /> through and connect it back to the roadway in the dedicated right of way. This will accomplish a much <br /> larger development area of approximately 390,000 square feet. On this option, the storm water <br /> management would take place in the tan areas shown. <br /> Mr. Redfoot then reviewed the contrasts between Option A and Option B as outlined below. <br /> Concept Plan Variable Concept Plan A Concept Plan B <br /> • Improved road alignment • Improved entrance <br /> Distinguishing Characteristics • Maintain existing stormwater intersection and internal <br /> ponds circulation <br /> • Largest area of development <br /> • Improved traffic circulation for vehicles and pedestrians <br /> • Proposed road along east side of site (dedicated right of way) <br /> Common to Both • Additions to existing buildings with associated parking <br /> • Maintain undisturbed southwest area <br /> • An additional 350,000 square feet of floor area available per <br /> Town's ordinance <br /> Development Area 220,000 sf 390,000 sf <br /> Undisturbed Area 7 acres 10 acres <br /> Ponds Relocated No Yes <br /> Infrastructure Cost Moderate High <br /> Impact Hardwoods in Southwest No No <br /> Corner <br /> Good potential for meeting Highest potential for <br /> Future Land Acquisition future space needs on this site, eliminating need for future <br /> without additional land land acquisition <br /> acquisition <br /> Multiple buildings on multiple Co-located, centralized <br /> Operational Costs sites increases operational buildings potentially lowers <br /> costs operational costs <br /> Potential for Accomodating County's High Highest <br /> Future Needs <br /> Mr. Waldon said in the Chapel Hill process, they're aiming for a modification of the special use <br /> permit which will take nine to twelve months. The mandatory first step is concept plan review. The <br /> application fee for the concept plan is modest but the special use application fee is based on square <br /> footage. They do not know the exact amount yet but they anticipate it being approximately $80,000. <br /> Mr. Waldon told the Board they were seeking their feedback on Options A and B, direction on what <br /> they would like them to take forward to the public information meeting on September 4th, and guidance into <br /> turning that into a full blown master plan they would bring back to the Board on October 16tn <br /> Commissioner Gordon asked them to explain what the Town Council wishes to do. Chair Pelissier <br /> replied they had received a letter today from the Town of Chapel Hill Mayor Kleinschmidt saying it would <br /> be preferable to wait until they have their joint meeting or perhaps schedule an additional meeting to <br /> discuss it. <br /> Commissioner Gordon then referred to page 4 (the bottom slide) and asked them to explain the <br /> purpose and rationale. She said she had taken the bullet points that they had given, and had written a <br /> statement to clarify the importance of pursuing a plan at this time. She read, "Orange County has the <br />