Browse
Search
2001 S Solid Waste - Waste Industries Inc fpr Curbside Recycling
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2001
>
2001 S Solid Waste - Waste Industries Inc fpr Curbside Recycling
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2012 9:25:48 AM
Creation date
10/15/2012 4:11:22 PM
Metadata
Fields
Template:
BOCC
Date
6/19/2001
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8o
Document Relationships
Agenda - 06-19-2001-8o
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 06-19-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor representatives may distribute material unrelated to this program to participants in the <br /> program at times other than during operation of the program; however, County must be informed in <br /> advance of such distribution and its contents. <br /> County shall conduct public awareness programs and residential education programs to assure <br /> proper preparation of recyclable materials and to encourage the public to remove lids from all <br /> containers and flatten plastic bottles, and aluminum and steel cans before depositing these items in <br /> their recycling containers. <br /> SECTION 16 <br /> Compensation for Services <br /> County agrees to make monthly payments to Contractor within thirty(3 0)days of receipt by County <br /> of an accurate invoice and corresponding collection data. Charges must be billed at the rates agreed <br /> on in Section 3 of this Contract for the corresponding period of service(from July 1,2001 through <br /> June 30, 2002,or from July 1,2002 through June 30,2003). In-Town Curbside and Rural Curbside <br /> must either be billed on separate invoices, or clearly itemized on one invoice. Data for the In-Town <br /> Curbside and Rural Curbside programs must be reported separately. <br /> If there are questions regarding the invoice or collection data,payment shall be guaranteed within <br /> thirty(30)days of satisfactory resolution of the questions on the invoice or collection data. <br /> If Contractor should fail to provide requested and necessary corollary services required as part of <br /> this contract,payment on up to two months' invoices may be withheld until such services are <br /> provided. Corollary services include: <br /> Repairs or replacement of County and or Towns' property,or private property due to <br /> damage caused by Contractor as part of the recycling operation. Any repairs or replacement <br /> must be complete within thirty(30)days of damage. <br /> Removal,within 24 hours of written of faxed notification,of improperly placed roll-off <br /> y, containers when requested from the temporary storage areas on County or Town of Chapel <br /> Hill property. <br /> In the event of severe weather or other event which necessitates the temporary cancellation of <br /> recycling services, County may negotiate with Contractor and receive a reduction in cost of services <br /> for services which were not rendered. In general,if services are temporarily canceled at County's <br /> request,County will pay in full for services which are not performed(except as otherwise noted <br /> within this Contract),and in such case County may request that Contractor provide said services on <br /> a make-up day at no further cost to County. If Contractor is unable to provide service due to severe <br /> weather or other event,County may negotiate with Contractor and receive reduction in the cost of <br /> services,to be deducted from the bill for the period during which services were not provided,or <br /> from a bill for any service period following that service period. Any reduction in the costs of <br /> services shall be based upon the pro-rata share of services not rendered minus Contractor's <br /> verifiable overhead expenses plus any verifiable increased expenses(i.e. overtime costs incurred by <br /> Contractor due to excessive amounts of recyclable materials having been held over during period of <br /> cancellation). <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.