Orange County NC Website
6 <br /> b. The onsite waterline loop and hydrant system can be constructed as currently <br /> designed. <br /> C. The domestic water service line for the school site can be constructed as currently <br /> designed. <br /> d. No substantial impact to the school's construction schedule or onsite construction <br /> cost would be anticipated (assuming a timely decision to implement this option). <br /> The total estimated cost of Option#2 is $ 600.000. The tank could be in service before <br /> the June, 2002 school occupancy date. <br /> i <br />