Orange County NC Website
18 <br /> Orange County Page 5 of 5 <br /> Effective: January 1, 2006 <br /> 5. Low Demand Retrofits <br /> The County determines priority needs and pursues water conserving system <br /> retrofitting, based on the availability of funds and maintenance needs such as the <br /> condition of the equipment. <br /> 6. New Construction <br /> New construction is required to follow water efficiency standards as set forth by the <br /> Guidelines for Sustainable Public Facility Design and Development. Consideration <br /> is given to the feasibility of rainwater collection for non-potable uses <br />