Browse
Search
Agenda - 10-16-2012 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 10-16-2012 - Regular Mtg.
>
Agenda - 10-16-2012 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 9:13:52 AM
Creation date
10/12/2012 2:55:18 PM
Metadata
Fields
Template:
BOCC
Date
10/16/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 10-16-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
67 <br /> ' <br /> Steps in the Process—Special Use Permit-Modifica4ion Appllcation Review: , <br /> • Required pre-submittal meeting with Planning Staff to review completed application. � <br /> • Required Department Head Review meeting(DHR}to discuss application. <br /> • Required Public Inf.ormation Meeting(PIM). ', <br /> • Optional meeting with Planning Staff to discuss DHR and PIM comments. � <br /> • Following revisions to application,optional meeting with Planning Staff to discuss the staff's ' <br /> preparation of a memorandum and recommended stipulations for approval. i ' <br /> • Required meeting with Planning Board, Planning Board required to make recommendation to the ' <br /> Town Council at a Public Hearing. May require a second meeting'rf Planning Board does not ', <br /> make recommendation at first meeting(although it usually does). <br /> • Required meeting to present to Transportation Board. ' <br /> • Required meeting to present to Bicycle and Pedestrian Advisory Board. <br /> • Required meeting to present to Community Design Commission. . <br /> • Required meeting to present to Parks and Recreation Commission. <br /> • Required meeting to present to Town Council at Public Hearing. <br /> • Required meefing of Town Council,post-hearing,for Council to consider action. Town Council � ' <br /> not required to act;can ask for more information and subsequent return. � <br /> Summary-Number of Meetings to Attend and Present Materials: <br /> For Concept Plan Process: 5 meetings at Town Hall(3 required) ' <br /> For Special Use.Permit Process_i 12 meetings at Town Hall(10 required)^!�!_^__� ' <br /> Total: 17 meetings(13 required) <br /> Following are budget implications of these facts <br /> • Budget for taking applications through the process(assuming 6-7 meetings): $28,000. '� <br /> • Anticipated budget for full 17-meeting process,with full consultant presence: $65,500. ', <br /> • Additional Cost of full consultant presence at all 17 meetings $37,500. <br /> Menu of Options for consideration: <br /> • Adjust Scope and Budget for project for Phase 2,and increase project budget by$37,500. <br /> • Or,alternatively, decide that there will be up to 10 meetings covered by County staff,without <br /> consultant participation. <br /> • Or,adjust our approach for allocation of consultant resources to some or all of these meetings ' ' <br /> (fewer consultant attendees}. <br /> • Or,a combination of these options. <br /> From the list of ineetings, above, if attendance were to be limited to Courrty staff (no consultant <br /> presence),we would suggest that the meetings most suitable for this approach would be, in order: ' <br /> the Public Information Meeting, meetings with Town Advisory Boards, and meetings with Staff to ' <br /> review procedural logistics. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.