Orange County NC Website
Design Guidelines <br /> • Orange County 2030 Comprehensive Plan <br /> • Chapel Hill 2020 Plan <br /> • Chapel Hill Design Guidelines <br /> • TJCOG High Performance Guidelines for Triangle <br /> Region Public Facilities <br /> • Planning Best Practices <br /> 4 <br /> Design Guidelines <br /> • Site Planning <br /> • Infrastructure <br /> • Undisturbed Areas <br /> • Sustainability <br /> • Buildings <br /> s <br /> Adjustments to Master Plan <br /> • Based on Concept"B"from August 21 Meeting <br /> • Added Connection to Carolina North Greenway/ <br /> Bikeway <br /> • Added Homestead Road Improvements <br /> • Clarified Language Regarding Expansion of <br /> Existing Buildings <br /> • Clarified Buffer and Setback Lines <br /> Attachment 2 <br /> Master Plan Presentation <br /> 6 <br />