Orange County NC Website
All Seasons Landscapes <br /> Dan, <br /> Thank you for the opportunity to submit a bid for the proposed work at the animal facility on Eubanks <br /> Rd. <br /> Scope of work: <br /> 1. Stockpile 540 cubic yards of topsoil(sample already provided and accepted)in field behind Dan's <br /> office. <br /> 2. Soil to be spread—2 inches thick in areas discussed with Dan. Prior to and once applied wberever <br /> possible,contractor will aerate where topsoil will be and has been applied in order to aid in incorporating <br /> topsoil into existing soil bed. <br /> 3. Contractor will work with onsite supervisor to facilitate delivery, storing,and applying topsoil. <br /> 4. Any unused topsoil remains at the storage area. <br /> 5. Work,once commenced,must be completed in a period to be no longer than one and half months from <br /> start date. <br /> 6. Start date will be within one month of awarding the contract. <br /> 7. Payment for soil on delivery. <br /> 8. Payment for labor on a weekly basis never to exceed work accomplished. <br /> Cost: <br /> Soil: 540 yds delivered: $10015.20 <br /> Labor for spreading soil:$15,000 <br /> Labor for ramping soil pile:$1,200 <br /> Thank you, <br /> Chuck Hellgevolldd ✓� /� <br /> All Seasons Landscapes/Can Do Landscape Materials and Services <br /> (919)732-5343 office <br /> (919)417-3496 cell <br />