Browse
Search
2012-375 AMS - 5th Wall Roof Replacement Design Battle Courtroom $10,100
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-375 AMS - 5th Wall Roof Replacement Design Battle Courtroom $10,100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2012 3:55:55 PM
Creation date
10/9/2012 3:35:02 PM
Metadata
Fields
Template:
BOCC
Date
10/8/2012
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
2012-375 S AMS - 5th Wall Roof Replacement Battle Courtroom $10,100
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,fk <br /> hWALL <br /> bUILPIN4 PIA(�NO5TiC5 CON5ULTANT5 <br /> June 22,2012 <br /> Jeff Thompson <br /> Orange County Asset Management Services <br /> 131 West Margaret Lane <br /> PO Box 8181 <br /> Hillsborough,NC 27278 <br /> RE: Roof replacement design services <br /> Battle Court Addition <br /> Hillsborough,NC <br /> 5thWall Proposal No. 12-06-13 <br /> Dear Mr.Thompson: <br /> At your request we have prepared this proposal for providing selected services for the referenced project. <br /> Generally, the services to be provided include preparation of design documents for remedial roofing of <br /> the referenced facility. Also included is administration of the project during construction. <br /> In general our services will consist of the following: <br /> A. Design <br /> 1. Meeting with representatives of Orange County to discuss the parameters of the project. <br /> 2. Reviewing documentation regarding the existing roof systems. <br /> 3. Preparing design documents to include: <br /> • Plans, technical specifications, general conditions, and bidding documents. Roof <br /> design to address but not necessarily be limited to such items as: <br /> Wind uplift <br /> Fire resistance of the roof assembly <br /> Current codes and standards <br /> Moisture transmission(vapor retarder)requirements <br /> Drainage requirements <br /> Type of insulation <br /> Roof system type . <br /> Warranty <br /> Sheet metal flashings <br /> Perimeter and penetration terminations <br /> • Preparing an opinion of estimated construction cost <br /> • Preparing an opinion of estimated project schedule <br /> 9601 Baileywick Rd•Raleigh, NC 27615 www.5thwallbdc.com <br /> 919/616-4715 <br />
The URL can be used to link to this page
Your browser does not support the video tag.