Orange County NC Website
EFLAND SANITARY SEWER IMPROVEMENTS <br /> PUMP STATION BREAK DOWN WITH ORGINAL VERSUS CHANGE ORDER COSTS <br /> DATE: JULY 31,2012 <br /> ORGINAL PS CHANGE ORDER PS <br /> DESCRIPTON UNIT PRICE UNIT PRICE <br /> Excavation,Installation_and Backfill Wet Well $ 17,500.00 $ 59,700.00 <br /> Hauling of Excavated Material from Wet Well and <br /> Returning $ - $ 14,500.00 <br /> Installation of Piping,Pumps and Valve Vault $ 26,428.00 $ 44,500.00 <br /> Wet Well(Material OMy) $ 4,362.00 $ 16,995.00 <br /> Wet Well Coating(Subcontractor) $ 5,426.00 $ 7,806.00 <br /> Valve Vault(Material Only) $ 2,200.00 $ 2,200.00 <br /> Piping(Material Only) $ 12,100.00 $ 19,134.00 <br /> Electrical(Subcontractor includng Generator with <br /> 150 kw priced in CO) _ - $ 65,538.00 $ 100,064.00 <br /> Additional cost to Install Concrete Ballast beyond <br /> Unit Price $ - $ 4,250.00 <br /> Crane Rental _ $ - $ 6,600.00 <br /> Pumps(Material Cost) $ 29,546.00 $ 78,220.00 <br /> Fence(Subcontractor) $ 8,800.00 $ 8,800.00 <br /> Clearing(PS Site) $ 10,000.00 $ 12,000.00 <br /> Telephone Conduit $ 800.00 $ 800.00 <br /> 3W Water Service(Installation and Materials) $ 2,700.00 $ 2,700.00 <br /> Site Grading $ 7,500.00 $ 12,000.00 <br /> Bollards --- $ - 700.00 $ 700.00 <br /> PS Wall Mounts $ - $ 3,500.00 <br /> Fuel for Generator $ 1,400.00 $ 3,280.00 <br /> Manhole#1 (Additional Depth) $ - $ 1,970.00 <br /> TOTAL $ 195,000.00 $ 399,719.00 <br />