Orange County NC Website
Buckhorn Area North of 1-85 and Efland Sewer System Improvements <br /> Project <br /> Orange County, North Carolina <br /> Summary of Brookhollow Pump Station Redesign Pricing <br /> PUMP STATION BID PRICING <br /> 77 Constructing 250 GPM Pump Station 1 LS $195,000.00 $195,000.00 <br /> 9 8"DIP 6'-8' 86 LF $40.77 $3,506.22 <br /> 26 Installing extra depth manholes above 6' 0 LF $123.00 $0.00 <br /> $198,506.22 <br /> PUMP STATION REDESIGN PRICING <br /> 77 Constructing 550 GPM Pump Station 1 LS $399,719.00 $399,719.00 <br /> 9 12" DIP 24'-26' 90 LF $180.00 $16,200.00 <br /> 26 Installing extra depth manholes above 6' 15 LF $123.00 $1,845.00 <br /> $417,764.00 <br /> ANTICIPATED COST IMPACT OF PUMP STATION REDESIGN $219,257.78 <br /> * NOTE: Unit price items may change due to site conditions and actual quantity installed. <br /> 4 <br />