Browse
Search
2011-291 AMS - J. F. Wilkerson Contracting Company for contract work for Efland Sewer
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-291 AMS - J. F. Wilkerson Contracting Company for contract work for Efland Sewer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 9:46:52 AM
Creation date
10/4/2012 3:53:13 PM
Metadata
Fields
Template:
Contract
Date
8/31/2011
Contract Document Type
Contract
Agenda Item
8c
Amount
$2,942,954.46
Document Relationships
Agenda - 08-23-2011 - 8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 08-23-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
violate this Contract or discharge the Surety from its obligations. Whenever during the progress Of the work any <br /> additional work or materials or changes or modifications in-the work or materials contracted for are agreed upon <br /> between the Owner and the Contractor, such additional work�or 'materials, alterations or modifications shall be <br /> considered and treated as though originally contracted for and shall be subject to all terms and conditions and <br /> provisions of the original amount. <br /> SECTION VIII: Whenever the Contractor is not upon any part of the work where it is desired by the Engineers to <br /> give*instructions, the Superintendent or Foreman,who may be in charge of the particular part of said work,shall <br /> receive and obey said instructions from the Engineers, provided such instructions are in cbrapliance with the <br /> Contract. <br /> SECTION IX: The party of the first part may require the Contractor to furnish-additional materials, and to do <br /> additional work not provided in the Contract or in the Specifications, but which may be found necessary to the <br /> proper prosecution and completion of the work embraced.in this Contract,at prices to be fixed by the prices named <br /> in the Proposal,or on Material and Force Account,with fifteen(15)percent added for overhead and profit No other <br /> work than that included in the Contract shall be done,and n'o additional material shall be furnished by the Contractor <br /> without written order from the Engineers. In the absence of such written order from the Engineers,the Contractor <br /> shall not be entitled to•payment for such additional work. Wills for'extra work shall be filed in triplicate with the <br /> Engineer within 24 hours after such work is done,in order that the Engineer may check and establish the accuracy of <br /> the extra work bills. in making charge for extra work no allowance shall be made for the use of small tools. <br /> SECTION X; The party of the firsit part acting through the Engineers reserves the right to place inspectors.on the <br /> work or at the place of shipment,or delivery of materials, or at factory or works of the Contractor,to observe the <br /> quality and character of the work.done and materials used and the Contractor agrees to afford said inspectors all <br /> proper facilities for carrying out their duties. <br /> It is agreed.and understood that the right of the party of the first part through its Engineers, or Inspector, or other <br /> agent to supervise the work and materials,is retained,in order to secure the completion of the work according to the <br /> Plans, Specifications, and Contract without unnecessary inconvenience to the public, but nothing contained in the <br /> Contract and Specifications shall be taken or understood to authorize such control of any of his, their, or its <br /> obligations,or as to make the Contractor an agent of the party of the first part <br /> The Engineer may interpret but has no power to vary the terms of this Contract and any variation from the terms <br /> shall be at the Contractor's own risk. <br /> SECTION XI: The Contractor will indemnify and hold harmless the Owner and Engineer, their agents,servants, <br /> and employees, from and against any and all costs, loss, expense or damage of any kind, including attorney's bies, <br /> "threatened against or suffered by said parties and arising in any matter out of this Contract or this work contemplated <br /> by this Contract,due to any act of negligence,omission or commission on his part.. <br /> Contractor guarantees the faithful performance of the terms of this Contract and the payment for all materials and <br /> labor necessary or famished for the performance of the work hereunder, paymeni and performance bonds as set <br /> forth in the specifications hereto being attached to this Contract and specifically incorporated herein by reference. <br /> SECTION X11- The Contractor agrees to look after the execution of this Contract personally, and agrees not to <br /> assign or sublet any portion of same without the consent of the party of the first part The subletting or assignment <br /> of any part of the work by the-Contractor shall not in any way relieve the Contractor of his responsibilities or <br /> obligations,and the party of the first part will took to the Contractor and not to the subcontractor or assignee for the <br /> faithful performance of the work. <br /> SECTION XIII: The Contractor shall immediately remove and reconstruct at his own expense all work or materials <br /> not in accordance with this Contract, and any failuie on the part of the Engineer to disapprove of any work or• <br /> material at or before a monthly estimate,'or at any otheitime before the final completion and acceptance of the <br /> entire work or material,or any part of it,shall not relieve the Contractor or Surety on his Performance and Payment - <br /> Bonds from their obligations of faithful performance of the Contract, notwithstanding such work or material may <br /> have been estimated and paid for. <br /> SECTION XIV: Partial payments will be made once a month on 95 percent of the actual work completed to the <br /> satisfactory of Orange County.There will be no compensation for materials stored on-site. Payment will be based <br /> upon completed work at the unit or hump sum prices named in the Items. Retainage may be reduced to zero percent <br /> 113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.