| SECTION I: W1TNESSETH,That for and in•consideration of the payments to be made the CONTRACTOR at its,
<br />     			their,or his own proper cost and expense and with skill and diligence,hereby agrees to do all of the work,furnish all
<br />     			of the materials, labor and equipment necessary to -construct, complete ready for continuous use and place in
<br />     			operation such portion thereof as may be awarded to said Contractor, all in accordance with the Specifications
<br />      			attached and the Plans and Instructions to Bidders and the Proposal,and such detailed directions,drawings, and so
<br />      			forth as may be given by the Engineer from time to time during the construction, and in full compliance with the
<br />      			Agreement.
<br />      			SECTION I1: The party of the first part agrees to pay and the party of the second part agrees'to receive the prices
<br />      			stated in the proposal attached hereto in .full compensation for furnishing materials and for all labor in moving
<br />      			materials and executing all the work contemplated in this Contract; and the party of the second part for said
<br />      			consideration shall be responsible for all loss or damage arising out of the nature of the work aforesaid or from any
<br />      			action of the elements, or from any unforeseen 'obstruction or difficulties which may be encountered in the
<br />      			prosecution'of the work and the delivery of same,and for all risks of every description connected with the work,and
<br />      			furnishing the.materials,.until their final completion and acceptance; also for all expense incurred by or in
<br />      			consequence of the suspension or discontinuance of said work and furnishing said materials,according to the Plans,
<br />      			Specifications,and requirements of the Engineer under them.
<br />      			SECTION Ill: Whenever the word"OWNER" is used, it shall be held to mean ORANG)B'COUNTY.  Whenever
<br />      			the word"CONTRACTOR"is used,it shall be held to mean the Contractor,or firm of Contractors,or any member
<br />      			of the firm contracting for any part of the work or materials herein specified, viz: The party of the second part of
<br />      			this.Agreement,his their, or its authorized agent.  Whenever the word'.ENGINEER!' is used, it shaII be held to
<br />      			mean the Engineer of Coulter Jewell Thames,P.A.,or his authorized representative,except as specifically provided
<br />      			by the Owner.
<br />      			SECTION 1V:  The work shall'be commenced not Iater than the date set by the Owner in the NOTICE TO .
<br />      			PROCEED and diligently prosecuted to completion within the time stated in the Bid Form, thereafter, with
<br />      			allowance for abnormal weather. Should the work or delivery of materials be interrupted or delayed by abnormal
<br />      			weather, the time of completion shall be extended by the amount of tune of said'delay or interruption caused by
<br />      			abnormal weather. Abnormal weather ii defined as tornados, hurricanes, floods and excessive inclement rainy '
<br />      			weather above and beyond reasonable anticipated rainy weather. For the purpose of this Contract,'the Contractor
<br />      			agrees to anticipate and plan for inclement rainy weather for the number of calendar days in accordance with the
<br />      			following table:
<br />      								ALLOWANCE FOR RAINY DAYS/MONTH
<br />  						January	7     Aril 	6     July      	8     October 	5
<br />  						February       6     May  	7     August  	6     November      5
<br />  						March 	7     June  	6     September      5     December      6
<br />      			No allowance for an extension of the contract time will be.aliowed for rainy days until the above allowance has been
<br />      			exceeded for each .month. For an allowance of additional time due to rainy weather, the'Contractor will need to
<br />      			substantiate to the satisfaction of Orange County that there was an excess of rainy days beyond that referenced in the
<br />      			chart above 'using data from the National Weather Service Station at RDU Airport, North Carolina or at another
<br />      			nearby weather station acceptable to Orange County. It is further agreed that the Board of County Commissioners
<br />      			shall have the right at its discretion to extend the time-for completion of the work. The Contractor agrees to pay to
<br />      			the Owner as liquidated damages the sum of$80o.00 for each consecutive calendar day that the work remains
<br />      			incomplete between the agreed completion date and the date of actual completion and any adjustments to the date of
<br />      			actual completion so approved by change order by Orange County.
<br />      			SECTION V:  The Contractor agrees not to employ an incompetent or disorderly person on the work, and shall
<br />      			employ competent and experienced foremen to be in charge of the work,or subdivisions thereof.
<br />      			SECTION VI:  The Engineer shall determine the quality and quantity of the several kinds of work and materials
<br />      			which are to.be paid for under this Contract; and shall determine all questions in relation to lines, levels, and
<br />      			dimensions of the work,and in respect of the interpretation of the Plans and Specifications.
<br />      			SECTIONVII: The party of the first part,through the Engineer,shall have the right to make alterations, additions,
<br />      			modifications, or omissions in the Plans and Specifications for the work without notice to the'Surety on the
<br />      			Performance and Payment Bonds', and such alterations, additions, modifications, or omissions shall not void or
<br />    											112
<br /> |