Browse
Search
2012-368 AMS - Warren-Hay Mechanical Contractors Inc for duck change order $131.54
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-368 AMS - Warren-Hay Mechanical Contractors Inc for duck change order $131.54
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2012 4:07:14 PM
Creation date
10/1/2012 3:58:36 PM
Metadata
Fields
Template:
BOCC
Date
9/27/2012
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
2012-368 S AMS - Waren - Hay Mechanical Contractors Inc for duck change order $131.54
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Vi PU <br /> MIENGINEERS <br /> REECE, NOLAND & WELRATH, INC. <br /> 409 North Haywood Street•P.O.Box 540 <br /> Waynesville,North Carolina 28786-0540 <br /> Waynesville 828-456-9851 •Toll Free 822-849-0486 <br /> Fax 828-456-6205•Email rnm(a)rnm-engineers.com <br /> CHANGE ORDER NO. 2 (Revised) <br /> PROJECT: John M.Link,Jr. Government Services Building HVAC Renovation <br /> CONTRACT FOR: Mechanical Construction <br /> TO: Warren-Hay Mechanical Contractors,Inc. <br /> You are directed to make the following changes in this Contract: <br /> • Provide&install(1)zone damper and(1)additional grille with related ductwork in downstairs in computer area.Drawings <br /> state there is an existing zone in this area,but one did not exist. <br /> • Adjust the final total of Change Order#1 based on actual material utilized. <br /> The original Contract Sum was $679,326 <br /> Net"Not to Exceed"change by previous Change Orders $13,080 <br /> The Contract"Not to Exceed"Sum prior to this Change Order was $692,406 <br /> The Contract Sum will be decreased by this Change Order -$131.54 <br /> The new Contract Sum including this Change Order will be $692,274.46 <br /> The Contract Time will be unchanged <br /> SIGNER: REECE,NOLAND&McELRATH,INC. <br /> By: <br /> Date: % Z z <br /> CONTRACTOR:Warren-Hay Mechanical Contractors,Inc. <br /> By: <br /> Date: rl <br /> OWNER: Orange County,NC <br /> By: <br /> Date: <br /> YAOrange Co Link Geothermal 2011019.00\Correspondence\change order#2 Revised.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.