Browse
Search
Agenda - 10-02-2012 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 10-02-2012 - Regular Mtg.
>
Agenda - 10-02-2012 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 10:57:35 AM
Creation date
9/28/2012 3:12:26 PM
Metadata
Fields
Template:
BOCC
Date
10/2/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
Minutes 10-02-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
29 <br /> ��r��r��tr�r��n�,�iy��� <br /> 5��Milnm at P�el�miinarty <br /> t L�eally IPr��rr��l <br /> �,* Allk�r�rw�kdrr�� <br /> � ��I <br /> / � <br /> �( Sccrpin� � <br /> ��� ww�� �,� <br /> � <br /> Pn�Niimifo�eiry En�ine��riin�� �I,��"` <br /> oir�IE�win�ram�m�al Imp,�cti <br /> �fiaY�rt4ant�P�dC1E18� � <br /> � <br /> %Finali S�Iw��INrwri z�'� „� <br /> ( L�aeally Ip��rr�mi <br /> �mm^ A�tuwr��tfu� i�� <br /> � <br /> Pn�Niimifo�eiry En�ine��riin�� "� <br /> Finall IE�rvir�anmam�aul Im p�ct <br /> ���NTNUI'X� II��;: <br /> �� <br /> � E virtarorru�n�aY IFk,��mrCd �� <br /> a�I[���cl�aNnm <br /> ��� � ��� <br /> Fln�l'I@e�ig�n <br /> CtbfliG�Y1YC$i4'A7 <br /> Through the jointly adopted 2035 Long Range Transportation plan by the Durham-Chapel Hill- <br /> Carrboro MPO(DCHC MPO)and the Capital Area MPO(CAMPO),transportation corridors in <br /> greatest need of more detailed planning and analysis were identified. The Alternatives <br /> Analysis(AA),completed in 2011,focused on a set of needs and alternative actions to address <br /> these needs,and generated information needed to select an option for further engineering <br /> and implementation. In February 2012,the DCHC MPO selected a 17.3-mile light rail corridor <br /> from East Durham to UNC Hospitals as the locally preferred alternative(LPA). Triangle <br /> Transit,as the local project sponsor,will submit to FTA the New Starts projectjustification <br /> ":b/:3�/�G���-Page � 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.