Orange County NC Website
a/1�/12 2040 MTP and CTP 34 <br /> Performance Measures <br /> SE Data Scenario 2010 2040 CommPlan CommPlan AIT CommPlan AIT <br /> Transportation Network 2010 E+C Highway Moderate Moderate Transit Transit <br /> 3.2.15 Rail LRT RDU Connection EB(ID: 251) N/A N/A N/A N/A 1,683 2,244 <br /> 3.2.16 Rail LRT RDU Connection WB(ID: 252) N/A N/A N/A N/A 541 917 <br /> 3.2.17 Rail LRT Wake 2 Long EB(ID: 253) N/A N/A N/A N/A 6,382 7,731 <br /> 3.2.18 Rail LRT Wake 2 Long WB(ID: 254) N/A N/A N/A N/A 10,863 12,932 <br /> 3.2.19 Rail LRT CHT Cnctr(ID: 301) N/A N/A N/A N/A 94 103 <br /> 3.3 Total Rail Ridership N/A N/A 26,890 31,922 63,062 78,945 <br /> 4 Demo�raphics Measures <br /> 4.1 Population 403,494 632,102 632,102 632,102 669,124 632,102 669,124 <br /> 4.2 Employment 261,566 427,876 427,876 427,876 428,337 427,876 428,337 <br /> 4.3 Total Daily Person Trips 1,775,182 3,073,472 3,116,728 3,098,552 3,183,664 3,106,960 3,191,817 <br /> 4.3.1 Work Person Trips 335,271 579,478 588,790 582,580 591,338 585,752 594,719 <br /> 4.4 Total Daily CV Trips 137,279 211,324 211,324 211,324 211,592 211,324 211,592 <br /> 4.4.1 Daily Truck Trips 57,715 85,991 85,991 85,991 85,992 85,991 85,992 <br /> 5 Other Measures <br /> 5.1 Lane Miles 2,472 2,548 2,979 2,737 2,737 2,842 2,842 <br /> CV=Commercial vehicles(which includes large and small trucks and vans. <br /> Trucks=Subset of CV that includes only large trucks. <br /> Transit ridership is higherthan transit trips because transfers are counted mulitple times in ridership numbers. <br /> Average Speed(1.3 and 1.4),Percent of Congested VMT(1.11 and 1.12)and Hours of Delay(1.10) calculations do not include <br /> local streets or centroid connectors(which often represent local streets in modeling networks) <br /> Performance Measures 2-5 <br />