a/1�/12 2040 MTP and CTP 33
<br /> Performance Measures
<br /> SE Data Scenario 2010 2040 CommPlan CommPlan AIT CommPlan AIT
<br /> Transportation Network 2010 E+C Highway Moderate Moderate Transit Transit
<br /> 2.3.3 - Bus 25,416 34,741 37,027 31,730 31,495 34,188 33,862
<br /> 2.3.4 - Rail - - - 5,719 6,854 14,583 17,813
<br /> 2.3.5 - Non-Motorized (Bike and Walk) 101,821 165,869 158,458 163,674 190,068 158,798 184,229
<br /> 3 Transit Measures
<br /> 3.1 Transit Ridership by Prod. Ends Total Total Total Total Total Total Total
<br /> 3.1.1 -TTA(Including Rail) 5,362 8,853 9,858 32,777 38,760 70,658 86,916
<br /> 3.1.2 -CAT 16,639 22,957 24,986 42,763 44,330 45,698 47,725
<br /> 3.1.3 -CHT 26,788 38,460 39,061 37,476 38,194 45,900 46,888
<br /> 3.1.4 - DATA 17,637 25,924 26,614 22,467 21,719 25,359 24,399
<br /> 3.1.5 - NCSU 12,147 21,332 21,403 16,571 17,742 16,926 18,241
<br /> 3.1.6 - DUKE 14,007 17,358 17,631 17,204 16,342 17,274 16,446
<br /> 3.1.7 -OPT N/A N/A N/A N/A N/A N/A N/A
<br /> 3.1.8 -CARY 1,412 2,136 2,266 12,066 14,366 14,213 16,252
<br /> 3.1.9 Total 93,988 137,015 141,816 181,320 191,449 236,025 256,867
<br /> 3.2 Ridership By Prod. Ends by Routes
<br /> 3.2.1 Rail CR CP EB(ID:237) N/A N/A 2,061 2,637 634 1,009
<br /> 3.2.2 Rail CR CP WB(ID: 238) N/A N/A 2,061 2,637 1,870 2,212
<br /> 3.2.3 Rail LRT D-O 1 EB(ID: 239) N/A N/A 4,288 5,103 172 335
<br /> 3.2.4 Rail LRT D-O 1 WB(ID: 240) N/A N/A 4,288 5,103 255 477
<br /> 3.2.5 Rail LRT Wake 1 EB(ID: 241) N/A N/A 5,046 6,229 693 877
<br /> 3.2.6 Rail LRT Wake 1 WB(ID: 242) N/A N/A 9,142 10,207 1,389 1,770
<br /> 3.2.7 Rail CR Long EB(ID: 243) N/A N/A N/A N/A 2,280 2,874
<br /> 3.2.8 Rail CR Long WB(ID: 244) N/A N/A N/A N/A 8,215 9,730
<br /> 3.2.9 Rail CR West Cary NB(ID: 245) N/A N/A N/A N/A 699 808
<br /> 3.2.10 Rail CR West Cary SB(ID: 246) N/A N/A N/A N/A 469 491
<br /> 3.2.11 Rail LRT Apex-Cary NB(ID: 247) N/A N/A N/A N/A 3,460 4,623
<br /> 3.2.12 Rail LRT Apex-Cary SB(ID: 248) N/A N/A N/A N/A 1,727 2,461
<br /> 3.2.13 Rail LRT D-O 2 Long EB(ID: 249) N/A N/A N/A N/A 8,567 10,861
<br /> 3.2.14 Rail LRT D-O 2 Long WB(ID: 250) N/A N/A N/A N/A 13,051 16,474
<br /> Performance Measures 2-4
<br />
|