Browse
Search
Agenda - 10-02-2012 - 7d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 10-02-2012 - Regular Mtg.
>
Agenda - 10-02-2012 - 7d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 10:44:10 AM
Creation date
9/28/2012 3:08:37 PM
Metadata
Fields
Template:
BOCC
Date
10/2/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7d
Document Relationships
Minutes 10-02-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
RES-2012-087 Resolution - Comments to the DCHC Metropolitan Planning Organization Transportation Advisory Committee re 2040 Metropolitan and Comprehensive Transportation Plan
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br /> The land use scenarios are based on the following assumptions: <br /> Communitv Plan <br /> • Based on local comprehensive plans <br /> • Used in Deficiency Analysis (June 2012) <br /> All-in-Transit <br /> • Based on local comprehensive plans, plus... <br /> • Additional and enhanced transit oriented developments <br /> • Additional development attraction to rail and premium transit <br /> The table on the next page summarizes the highway and transit proj ects included in each <br /> of the three transportation networks. Section 7 provides a map and proj ect list for each <br /> transportation network. <br /> The remainder of this report is dedicated to presenting tables and maps that show the <br /> level to which each of the Alternatives meets the forecasted travel demand. Two <br /> additional Alternatives from the Deficiency Analysis are used for purposes of <br /> comparison. The MPO completed the Deficiency Analysis in June 2012 and the detailed <br /> results are available on the MPO Web page. <br /> • 2010— This is the current condition. It uses the current transportation network <br /> and current population and employment distribution. <br /> • E+C (Existing plus Committed) —This is the no build alternatives. It uses the <br /> current transportation network(including any committed proj ects) and the <br /> forecasted population and employment. <br /> Introduction 1-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.