Orange County NC Website
5 <br /> Buckhorn Area North of I-85 and Efland Sewer System Improvements <br /> Project ' <br /> Orange County, North Carolina ' <br /> Summary of Brookhollow Pump Station Redesign Pricing ; <br /> PUMP STATION BlD PRICING ', <br /> 77 Constructing 250 GPM Pump Station 1 LS $195,000.00 $195,000.00 ' <br /> 9 8" DIP 6'-8' 86 LF $40.77 $3,506.22 ', <br /> 26 Installing extra depth manholes above 6' 0 LF $123.00 $0.00 , <br /> $198,506.22 <br /> PUMP STATION REDESIGN PRICWG <br /> 77 Constructing 550 GPM Pump Station 1 LS $399,719.00 $399,719.00 , <br /> 9 12" DIP 24'-26' 90 LF $180.00 $16,200.00 ' <br /> 26 Installing extra depth manholes above 6' 15 LF $123.00 $1,845.00 ', <br /> $417,764.00 ' <br /> ANTICIPATED COST IMPACT OF PUMP STATION RfDESIGN $219,257.78 I <br /> * NOTE: Unit price items may change due to site conditions and actual quantity installed. ', <br /> ... <br /> - . �::;, . - <br />