Browse
Search
Agenda - 10-02-2012 - 5i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 10-02-2012 - Regular Mtg.
>
Agenda - 10-02-2012 - 5i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 9:56:44 AM
Creation date
9/28/2012 2:47:26 PM
Metadata
Fields
Template:
BOCC
Date
10/2/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5i
Document Relationships
2012-388 Planning - J F Wilkerson Contracting Co Future connection stub out N Oak Street $22,496.60
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2012
Minutes 10-02-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> EFLAND SANITARY SEWER IMPROVEMENTS <br /> PUMP STATION BREAK DOWN WITH ORGINAL VERSUS CHANGE ORDER COSTS ' <br /> DATE: JULY 31,2012 <br /> ORGINAL PS CHANGE ORDER PS <br /> DESCRIPTON UNIT PRICE UNIT PRICE <br /> Excavation, lnsta{lation,and Backfill Wet Well $ 17,500.00 $ 59,700.00 <br /> Hauling of Excavated Material from Wet Vllell and ' <br /> Retuming $ __ - $ _ 14,500.00 ' <br /> Installation of Piping,Pumps and Valve Vault___ $ 26,428.00 $ 44,500.00 I <br /> Wet Well(Material Only) $ __ 4,362.00 $ _ 16,995.00 <br /> — —— - ----- - <br /> Wet Well Coating_(Subcontractor) $ __ 5,426.00 $ 7,806.00 <br /> Valve Vault(Material Only) $ 2,200.00 $ 2,200.00 <br /> Piping(Material Only) $ 12,100.00 $ 19,134.00 , <br /> Electrical(Subcontractor includng Generator with ' <br /> 150 kw priced in CO) $ 65,538.00 $ 100,064.00 <br /> - -- ------ _ ----- --- - <br /> Additional cost to Install Concrete BaUast beyond <br /> Unit Price $ - $ 4,250.00 <br /> Crane Rental $ - $ 6,600.00 , <br /> Pumps(Material Cost) $ 29,546.00 $ 78,220.00 ' <br /> Fence(Subcontractor) $ 8,800.00 $ 8,800.00 <br /> Clearing(PS Site) $ 10,000.00 $ 12,000.00 <br /> Telephone Conduit $ 800.00 $ 8U0.00 <br /> 3!4"Water Service(Installation and Materials) $ 2,700.00 $ 2,70d.00 <br /> Site Grading $ 7,500.00 $ 12,000.00 <br /> Bollards $ 700.00 $ 700.00 <br /> PS Wall Mounts $ - $ 3,500.00 <br /> Fuel for Generator $ 1,400.00 $ 3,280.00 <br /> Manhole#1 (Additional Depth) $ - $ 1,97d.00 <br /> TOTAL $ 195,000.00 $ 399,719.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.